Public project record · Nepal
Development projects in Nepal
Explore projects reported by development organizations, donors, and public sources. Every record shows what is known, what is not reported, and where the evidence comes from.
- completed
ADPC Disaster risk reduction 2017-2023 - ADPC Disaster risk reduction 2017-2022
95%data completenessAsia Disaster Preparedness Center, ADPC, has applied to Sida for funding of 5 933 000 USD (54 million SEK) to carry out the "Building resilience through inclusive and climate-adaptive disaster risk reduction in Asia-Pacific" in Asia and Pacific during the period 2017-2022. The five-year program aims to enhance regional capacity for cooperation on disaster and climate risk management with an overall objective of building resilience of people in the Asia-Pacific region. This will be achieved by building on current good practices and providing technical assistance to select governments, civil society organizations and regional bodies. Key focus areas of the program include: emergency preparedness and humanitarian response management; facilitating the use of risk information and sex-age-disability-disaggregated data by policy makers and disaster managers; integrating disaster and climate change concerns into development policy and programs; promoting inclusion and protection-sensitive approaches in risk reduction and disaster preparedness, promoting gender equality and women leadership for risk resilience; and enhancing the role of the Regional Consultative Committee on Disaster Management (RCC) to support member countries on implementing global frameworks and serving as a conduit for South-South learning, transboundary risk reduction and knowledge sharing. ADPC will implement the intervention together with the Swedish Contingency Agency, MSB, Stockholm Environment Institute –Asia, and the Raul Wallenberg Institute.
- Organization
- Sida / Sweden
- Budget
- USD 880K
- Timeline
- Nov 29, 2017 → Dec 31, 2023
- Coverage
- Nepal
Complete record·2 sources - completed
U.S. Peace Corps Peace Corps
95%data completenessSupport costs incurred for direct support of volunteers in Nepal, including allowances, travel, supplies and equipment. Excludes costs for training or medical support costs.
- Organization
- Peace Corps
- Budget
- USD 263K
- Timeline
- Oct 1, 2024 → Sep 30, 2025
- Coverage
- Nepal
Complete record·17 sources - completed
U.S. Peace Corps Overseas Program Support
75%data completenessOverseas program support costs in Nepal. Includes costs related to HQ salaries and benefits for direct overseas support, travel, rent, communications, printing, supplies, equipment, and computer/technical support.
- Organization
- Peace Corps
- Budget
- — · not reported
- Timeline
- Oct 1, 2021 → Sep 30, 2022
- Coverage
- Nepal
Good record·16 sources - completed
U.S. Peace Corps Direct Volunteer Support
75%data completenessSupport costs incurred for direct support of volunteers in Nepal. Includes overseas staff salaries and benefit costs, leases, staff travel, communications, conferences, supplies, equipment and International Cooperative Administrative Support Services (ICASS). Excludes costs for training, medical and security.
- Organization
- Peace Corps
- Budget
- — · not reported
- Timeline
- Oct 1, 2021 → Sep 30, 2022
- Coverage
- Nepal
Good record·16 sources - completed
U.S. Peace Corps Volunteer In-Service Training
95%data completenessAll costs incurred for in-service training of volunteers in Nepal during their service, including language tutoring, workshops, and conferences.
- Organization
- Peace Corps
- Budget
- USD 254K
- Timeline
- Oct 1, 2018 → Sep 30, 2019
- Coverage
- Nepal
Complete record·8 sources - active
Nepal Earthquake Response
70%data completenessNo project description reported.
- Organization
- WaterAid Nepal
- Budget
- — · not reported
- Timeline
- Aug 3, 2015 → Jan 2, 2017
- Coverage
- Nepal
Good record·2 sources - active
Nepal - Earthquake recovery
80%data completenessThis is a 2.5 year project as part of the long term earthquake response programme. If the donor commits, he will support our work in 2 districts where we plan to reach 16,049 people with access to safe water, 11,064 with access to latrines and 17,790 with hygiene education.
- Organization
- WaterAid Nepal
- Budget
- — · not reported
- Timeline
- Sep 1, 2015 → Jun 30, 2018
- Coverage
- Nepal
Complete record·2 sources - active
Nepal earthquake appeal
75%data completenessShort term and long term emergency support following the earthquake in Nepal. Short term support includes safe water provision, temporary latrines, hygiene kits and hygiene awareness raising. Long term rehabilitation details will be confirmed in due course via a consultant in Nepal.
- Organization
- WaterAid Nepal
- Budget
- — · not reported
- Timeline
- Apr 29, 2015 → Aug 2, 2015
- Coverage
- Nepal
Good record·2 sources - completed
Post-Earthquake Reconstruction in Nepal - Building Back Better (J-483 Purnima)
80%data completenessEstablish partnerships with local & central government, communities and businesses to support the (i) districts effected by the Earthquake to “build back better” including leading to more resilient (including climate resilient) infrastructure and institutions; (ii) the most vulnerable recover their livelihoods and assets; and (iii) the Government of Nepal to plan for and manage the response to the earthquake. It is essential the gender and social inclusion issues are covered explicitly in all output areas and activities undertaken through the programme.
- Organization
- Social Development Direct Limited
- Budget
- — · not reported
- Timeline
- Feb 14, 2019 → Jun 30, 2020
- Coverage
- Nepal
Complete record·2 sources - completed
Improving the production, communication and use of scientific information in disaster preparedness, response and recovery
80%data completenessThe overall purpose of the research is to improve the use of scientific information in responding to future natural disasters in Nepal and beyond.
- Organization
- ODI
- Budget
- — · not reported
- Timeline
- Jan 3, 2017 → Feb 16, 2018
- Coverage
- Nepal
Complete record·2 sources - unknown
USAID/Nepal Flood Recovery Program
35%data completenessNo project description reported.
- Organization
- AidData
- Budget
- — · not reported
- Timeline
- Timeline not reported
- Coverage
- Nepal
Needs more data·1 source - completed
Disaster Risk Reduction at the National Level in Nepal - DRRNLN
65%data completenessDisaster Risk Reduction at the National Level in Nepal - DRRNLN
- Organization
- AidData
- Budget
- — · not reported
- Timeline
- Nov 15, 2007 → End not reported
- Coverage
- Nepal
Good record·1 source - completed
Conservation and Seismic Strengthening of the 18th-Century Octagonal Krishna Temple in Patan Durbar Square
95%data completenessBuilt through royal patronage in the early 18th-century, the octagonal Krishna Temple stands out for its innovative stone masonry construction. This project includes the development of a model seismic design for earthquake resistance in the conservation of damaged historic stone structures.
- Organization
- Department of State
- Budget
- USD 150K
- Timeline
- Oct 1, 2018 → Apr 30, 2021
- Coverage
- Lalitpur, Bagmati
Complete record·1 source - completed
Conservation of the 17th-19th-Century Hanuman Dhoka Durbar (Palace) in Kathmandu
95%data completenessThe complex, situated in the historical core of Kathmandu, was the residence and administrative center of kings from ancient times, symbolizing the height of medieval arts and architecture in Nepal. This project addresses conservation needs of the Palace Complex caused by the 2011 earthquake damage.
- Organization
- Department of State
- Budget
- USD 77K
- Timeline
- Sep 11, 2014 → Sep 14, 2015
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Joint Recovery Action Plan (JRAP) Project
95%data completenessThis opportunity is action plan to implement the Joint Recovery Action Plan prepared for Jajarkot Earthquake Response by UN HCT/UNRCO.The components under the shelter component will be aroundFacilitation for the disbursement of second tranche for temporary sheltersStandardization of socio-technical assistance for housing reconstruction
- Organization
- Catholic Relief Services
- Budget
- USD 32K
- Timeline
- May 1, 2024 → Jan 31, 2025
- Coverage
- Jajarkot, Karnali
Complete record·1 source - completed
Restoration and Seismic Strengthening of the Early 20th-Century Gaddi Baithak in Kathmandu Durbar Square, Phase 2 and Gateway
95%data completenessBuilt in 1907 as an addition to the Hanuman Dhoka, the royal residence of Nepali kings, and damaged during the April 2015 Nepal Earthquake, the Gaddi Baithak is one of the most prominent monuments in Kathmandu Durbar Square. This project, which continues work begun under a previous AFCP grant, directly supports the Embassys Integrated Country Strategy (ICS) Goal 2.
- Organization
- Department of State
- Budget
- USD 200K
- Timeline
- Oct 1, 2017 → Sep 30, 2019
- Coverage
- Kathmandu, Bagmati
Complete record·2 sources - completed
Kathmandu Pandemic Preparedness Exercise
95%data completenessTo bring pandemic preparedness experts, stakeholders and decision-makers in the region to a three day event in Nepal that will include a workshop, fieldwork, and a tabletop exercise
- Organization
- Department of State
- Budget
- USD 17K
- Timeline
- May 16, 2016 → May 16, 2017
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Conservation of the 8th-Century Lo Gekhar Monastery in Upper Mustang
95%data completenessLo Gekhar is widely considered to be the oldest Tibetan Buddhist monastery in Mustang. This project involves the documentation of the site and surrounding landscape, promotes inclusive socio-economic growth and builds capacities of local institutions and communities to mitigate disaster risks.
- Organization
- Department of State
- Budget
- USD 285K
- Timeline
- Oct 1, 2019 → Sep 30, 2023
- Coverage
- Mustang, Gandaki
Complete record·1 source - completed
Restoration of the 17th- and 18th-Century Patan Royal Palace, Phase 2
95%data completenessTo support the continuation of work begun under a previous Ambassadors Fund grant to restore the Patan Royal Palace, one of South Asias most intact historic urban royal ensembles. Major earthquakes in 1833 and 1934 and decades of neglect and disuse have left their mark on the palace, most of which dates from the 17th and 18th centuries. This phase includes the restoration of the late 18th-century Bahadur Shah palace wing.
- Organization
- Department of State
- Budget
- USD 205K
- Timeline
- Oct 1, 2011 → Sep 30, 2012
- Coverage
- Lalitpur, Bagmati
Complete record·1 source - completed
Structural Assessment and Restoration of Structures in Kathmandu Durbar Square Affected by the April 2015 Nepal Earthquake
95%data completenessThe April 2015 Nepal Earthquake caused extensive damage to historic monuments within Nepals Kathmandu Valley World Heritage site. This project involves the structural assessment and restoration of damaged monuments in Kathmandu Durbar Square restored previously with AFCP support.
- Organization
- Department of State
- Budget
- USD 200K
- Timeline
- Sep 1, 2015 → Jul 31, 2017
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Emergency Protection of the Kaiser Library Collections and Post-Earthquake Stabilization of the Late-19th-Century Kaiser Mahal in Kathmandu
95%data completenessSince the late 1960s, the Kaiser Mahal has been home to the Kaiser Library, one of Nepals oldest libraries. This project, which involves emergency stabilization of the south wing of the building and the protection of books, maps, manuscripts, furnishings, and other objects in the library, directly supports the U.S. embassys efforts to strengthen U.S. cooperation with the government and people of Nepal on disaster risk reduction and response.
- Organization
- Department of State
- Budget
- USD 400K
- Timeline
- Sep 20, 2017 → Sep 30, 2019
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Nepal Earthquake Response
80%data completenessA magnitude 7.8 earthquake struck Nepal in between Kathmandu and Pokhra. The epicenter was 30 km east-south-east of Lamjung district. The earthquake has caused a number of landslides and avalanches. Strong aftershocks, including a 6.7 magnitude quake on 26 April, continued to threaten the lives of thousands of people and to further damage buildings and infrastructure. Many people are afraid and have slept outside for several consecutive nights, in spite of the falling rain. According to UN, it is estimated that over 8 million people are affected in 39 of Nepal’s 75 districts. Over 2 million people live in the 11 most critically hit districts. CRS has committed resources to relief efforts and has requested Caritas to begin procuring emergency relief materials such as tarpaulins/shelter kits and water, sanitation and hygiene materials. CRS is also looking at transporting materials from India to Nepal and has contacted the UN Hub in Dubai to request options for humanitarian supply flights from Dubai. Caritas Nepal launched a response in the immediate aftermath of the disaster. Distribution of supplies, including food packages, tarpaulins, have already occurred. Through grassroots organisations and partner CBOs, and the ability to mobilise a high number of volunteers, Caritas Nepal is well placed to deliver an immediate relief and subsequent recovery programme. The scale of the disaster and the willingness of Caritas organisations to respond necessitates a rapid response through this appeal. This response will meet urgent needs in shelter, WASH, and non-food items. A follow up full Emergency Appeal will be prepared to include a comprehensive recovery strategy. The funding from this appeal will ensure Caritas Nepal can continue relief operations- focused primarily on immediate shelter needs non-food items, with a focus on provision of water and hygiene kits in 7 of the worst affected districts. 4 new district offices and warehouses will be established to coordinate and manage the response. CAFOD has since responded to the relief efforts and has deployed a number of staff to the country. Our response will focus on WASH, shelter and protection components.
- Organization
- CAFOD
- Budget
- USD 0
- Timeline
- Apr 28, 2015 → Apr 27, 2016
- Coverage
- Kathmandu, Lamjung
Complete record·1 source - completed
Operation Nepal Assist 2015: Defence Humanitarian Assistance
95%data completenessFollowing a devastating earthquake on April 25th 2015, the Australian Defence Force delivered over 13 tonnes of Australian Aid to Nepal and evacuated 106 Australian and other foreign nationals to Thailand. Using two RAAF C-17A Globemaster III strategic airlift aircraft, the Department of Foreign Affairs and Trade-supplied aid was flown into Kathmandu's Tribhuvan International Airport. Civilian evacuees then boarded the aircraft and were flown out to Bangkok. The C-17s also carried into Kathmandu five Defence personnel who were then integrated into the staff of the Australian Embassy to assist with the Australian Government response to the disaster.
- Organization
- DFAT Australian Aid
- Budget
- USD 542K
- Timeline
- Jan 1, 2015 → Jun 30, 2015
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Conservation and Seismic Strengthening of the 16th-Century Char Narayan Temple in Patan Durbar Square
95%data completenessBuilt primarily in brick and damaged during the April 2015 Nepal earthquake, the Char Narayan temple is one of the oldest and most prominent temples within the Patan Durbar Square World Heritage site. This project directly supports the U.S. embassys efforts to strengthen U.S. cooperation with the government and people of Nepal on disaster risk reduction and response.
- Organization
- Department of State
- Budget
- USD 100K
- Timeline
- Sep 29, 2017 → Jun 28, 2019
- Coverage
- Lalitpur, Bagmati
Complete record·1 source - completed
Application of molecular method to understand and manage Human Elephant Conflict in Parsa-Chitwan Complex, Nepal.
95%data completenessThe purpose of this project is to study the behavior and genetics of wild Asian elephants in the Chitwan-Parsa National Park complex of Nepal to better understand the drivers of conflict elephant behavior and overall population structure of this subpopulation in Nepal. Specific project activities include: 1) conduct a population survey using genetic techniques; 2) using dung samples perform ELISA tests on stress hormone levels in elephants; 3) extract DNA for DNA-based profiles of individuals; 4) establish and train a rapid response team for human-elephant conflict events; 5) conduct three visits for villagers of high HEC villages to elephant-bearing protected areas. This project will produce reports on the population status and structure of Asian elephants in the Chitwan-Parsa complex, contribute to a better understanding of stress on elephant conflict behavior, build a DNA-profile database of the existing population, create a well-equipped HEC rapid response team, and increase the tolerance of local inhabitants to elephants and overall contribute to the conservation of wild Asian elephants in Nepal. ."
- Organization
- Department of the Interior
- Budget
- USD 25K
- Timeline
- Jul 5, 2017 → Sep 30, 2018
- Coverage
- Parsa, chitawan
Complete record·1 source - completed
Earthquake
75%data completenessOn 25th April 2015 a devastating earthquake measuring 7.8 on the Richter scale occurred in Nepal, 48 miles from the capital of Kathmandu following which there were at least 30 aftershocks. Thousands were injured and thousands died. JOA granted Oxfam £30,000 for the provision of emergency food, access to clean safe water and hygiene kits, Save the Children £30,000 for the provision of shelter support, rope and essential household items, British Red Cross £30,000 for thousands of tarpaulins, oral rehydration salts, soap, water purification tablets and first aid. JOA also gave £50,000 to the Bailiff’s Disaster Appeal matching public fundraising in Jersey for the provision of a longer term sustainable project.
- Organization
- openmindedly
- Budget
- USD 0
- Timeline
- Jan 1, 2015 → Dec 31, 2015
- Coverage
- Kathmandu, Bagmati
Good record·3 sources - completed
Fire
75%data completenessOn 09 April, 2015, a sudden fire started from a house leaving 160 houses of a village in Rampura Malhaniya-5, Saptari in ashes. According to District Administration Office, properties worth Rs. 20 million were destroyed and 65 families were rendered homeless in the incident. The houses had thatched roofs and timber and bamboo walls hence the fire quickly spread throughout the village. JOA granted Habitat for Humanity £30,000 for the provision of emergency shelter.
- Organization
- openmindedly
- Budget
- USD 0
- Timeline
- Jan 1, 2015 → Dec 31, 2015
- Coverage
- Saptari, Madhesh
Good record·1 source - completed
Emergency response to 2024 Flooding in Nepal
75%data completenessThe emergency response project aims to provide comprehensive support to flood and landslide-affected communities through a series of targeted activities in Madhesh and Koshi province. These activities are designed to address immediate needs, enhance disaster response capabilities, and support for recovery and resilience following the 2024 flood. It also enhance the local disaster response team capacity and ensure healthe and dignity of the affected individuals. The major interventions include cash distribution, enabling families to prioritize their needs such as food, shelter, and medicine. Other activities involve providing emergency shelter and Non-Food Items (NFI), food support, hygiene kits, and restoring WASH facilities.
- Organization
- Action Contre la Faim France
- Budget
- USD 0
- Timeline
- Oct 4, 2024 → Nov 18, 2024
- Coverage
- Koshi, Madhesh
Good record·1 source - active
Nepal SURE programme
85%data completenessThe Strengthening Urban Resilience and Engagement ( SURE ) programme is a five-year DFID-funded multi-hazard urban risk reduction programme running from September 2016 until August 2021. Given emerging risks and hazard trends the programme continues engagement in the three districts of the Kathmandu valley and expanding further west into two additional districts. The programme aims to see increased action in target municipalities by citizens government and the Nepal Red Cross Society to reduce and respond to multi hazard risks increasing overall disaster resilience and enabling timely and effective response by the Nepal Red Cross Society. The targeted municipalities include six within the previously-engaged districts of the Kathmandu valley namely: Kathmandu sub-metropolitan city and Budhanilkantha municipality in Kathmandu district Bajrabarahi and Karyabinayak municipalities in Lalitpur district and Bhaktapur and Madhyapur Thimi municipalities in Bhaktapur district and two additional municipalities in the West and Far-West specifically Pokhara sub-metropolitan city and Dhangadhi sub-metropolitan city. Impact: Target municipalities have increased their disaster resilience and are supported by the Nepal Red Cross Society with timely and effective disaster response. Outcome: Targeted municipalities are increasingly taking action to reduce and respond to multi hazard risks through citizens government and the Nepal Red Cross Society. Output 1: Awareness and action in urban DRR for informed citizen voice and greater social accountability is increased enhancing DRR capacity in targeted municipalities. Output 2: DRR advocacy and support and strengthening of preparedness for response enhances the capacity of municipalities and is aligned to existing policies and structures. Output 3: NRCS is stronger and well organised in order to better respond to vulnerable communities and individuals. Output 4: NRCS and BRC actively learn with urban partners and external institutions to contribute to improved thematic and institutional knowledge and practice enabling efficient and effective programming with partners.
- Organization
- British Red Cross
- Budget
- USD 5.4M
- Timeline
- Aug 31, 2021 → End not reported
- Coverage
- Bhaktapur, Kathmandu
Complete record·1 source - completed
Durable Solutions III: Facilitating the Durable Solutions for Landless Households at Risk of or Displaced by Floods in Madhesh Pradesh jointly funded by Post-earthquake Reconstruction in Nepal – Building Back Better (205138)
90%data completenessDurable Solutions III: Facilitating the Durable Solutions for Landless Households at Risk of or Displaced by Floods in Madhesh Pradesh jointly funded by Post-earthquake Reconstruction in Nepal – Building Back Better (205138)
- Organization
- People in Need
- Budget
- USD 187K
- Timeline
- Jul 1, 2022 → Dec 31, 2022
- Coverage
- Madhesh, Nepal
Complete record·1 source
How to read project data
A missing budget or date means the source did not provide it to Nepal Impact; it is not an estimate. Completeness measures the presence of core fields, while data confidence reflects source-level trust. Use the original source and the correction link on each project page for verification.