Explore projects reported by development organizations, donors, and public sources. Every record shows what is known, what is not reported, and where the evidence comes from.
- active
F.a: Economic Empowerment of PWDs and Local Resource Mobilization
80%data completenessThe applicant organization was established by Women with Disabilities. The project plan is to provide leadership training for 30 leaders of local Self-Help-Groups, conduct an awareness raising campaign by broadcasting in FM radio, and to provide vocational training (goat rearing for 10 women, wood carving for five men).
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- — · not reported
- Timeline
- Jan 1, 2019 → Dec 31, 2019
- Coverage
- Nepal
Complete record·5 sources - active
F.a: Strengthening Human Rights of Dalit Women in Nepal
80%data completenessThe projects aims to increase awareness among Dalit women on human rights, national and international obligations of the state and other pertinent issues through evidence-based advocacy, to empower existing and future Dalit women leaders for ensuring econo mic rights of Dalit women with concrete economic empowerment initiatives and to create an enabling environment for increasing access of Dalit women to justice at the local level. The activities are expected to be instrumental in developing leadership of Da lit women, changing the political landscape and contributing to the protection and promotion of social and economic rights of Dalit women. www.fedonepal.org
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- — · not reported
- Timeline
- Jan 1, 2014 → Dec 31, 2019
- Coverage
- Nepal
Complete record·2 sources - active
UNICEF WASH and Education Programmes
95%data completenessThe Finnish Country Strategy for Development Cooperation in Nepal reduces poverty and promotes sustainable and equal development on three impact areas: 1) water supply and sanitation 2) high-quality education for all and 3) improving the rights and status of women and vulnerable groups. This project focuses on supporting UNICEF?s Country Programme Action Plan 2018-2022 (CPAP) for the Water and Sanitation Sector in Nepal. The Action Plan strengthens all the impact areas of the Finnish Country Strategy and in creases the synergies between them. Finland has supported UNICEF in Nepal in 2010-2018 with 12 MEUR. The project had significat impacts in sanitation coverage in Nepal. Finland supported UNICEF with 2 MEUR in the reconstruction of water and sanitation syst ems after the earthquake. As a result over 99 500 people benefitted from reconstructed/improved water systems and over 300 schools were supported in upgrading of their WASH facilities. The total budget for the intervention is 8 million euros for the years 2018-2022. The comments of the quality assurance board have been included in the project proposal.
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 9.1M
- Timeline
- Nov 7, 2019 → Dec 31, 2021
- Coverage
- Nepal
Complete record·2 sources - active
Finnpartnership programme
80%data completenessLong term partnership with a local company / organisation (e.g. joint venture; subcontractor, import or other contract agreement )
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 18K
- Timeline
- Aug 30, 2019 → Dec 31, 2020
- Coverage
- Nepal
Complete record·14 sources - active
Sustainable WASH for all
90%data completenessSustainable WASH for all in Nepal (SUSWA) strengthens the federalized governance system to guarantee the access to basic safe and sustainable drinking water sanitation services and improved hygiene practices at households schools public institutions and al l people in general including marginalized groups. The project is a bilateral project between the governments of Finland and Nepal. The Finnish funding is 9 million euros and it will run between 2019-2023.SUSWA has four Result Areas: 1) WASH governance at local level 2) Water Supply 3) Sanitation and hygiene and 4) Sector support and enabling environment.
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 10.3M
- Timeline
- Mar 28, 2019 → Dec 31, 2024
- Coverage
- Nepal
Complete record·3 sources - active
Tertiary Scholarships Selection Services 2026
80%data completenessTertiary scholarships are offered to partner developing countries to progress development and workforce planning objectives. This activity is for services to select 577 scholars from approximately 25 countries and to place them in New Zealand and Pacific tertiary institutions. All services will be managed by operational partner, Education New Zealand.
- Organization
- New Zealand Ministry of Foreign Affairs and Trade
- Budget
- — · not reported
- Timeline
- Aug 28, 2025 → Jun 30, 2027
- Coverage
- Nepal
Complete record·1 source - completed
COVID-19: Responsive COVID-19 Vaccines for Recovery Project under the Asia Pacific Vaccine Access Facility
100%data completenessThe project will support the procurement and delivery of safe and effective vaccines against COVID-19 through APVAX's RRC in compliance with ADB's vaccine eligibility criteria to the country. It aims to finance the procurement of about 15.9 million doses of vaccines, which will be administered to about 6.8 million Nepalese by 2024, with data collected and disaggregated by sex and age.
- Organization
- Asian Development Bank
- Budget
- USD 165.0M
- Timeline
- Aug 11, 2021 → Mar 28, 2024
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - completed
South Asia Subregional Economic Cooperation Customs and Logistics Reforms Program (Subprogram 1)
85%data completenessThe proposed program will support continuing reforms in customs through implementation of the Customs Reform and Modernization (CRM) Plan 2021-2026 and improving trade logistics through the preparation and implementation of a new Trade Logistics Policy (TLP) 2022.
- Organization
- Asian Development Bank
- Budget
- USD 50.0M
- Timeline
- Jul 5, 2023 → Dec 31, 2023
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - completed
COVID-19: Active Response and Expenditure Support Program
100%data completenessThe CARES Program aims to help the government in implementing its pandemic response plan the National Relief Program to respond to public health emergencies and to mitigate adverse economic and social impacts caused by the coronavirus disease (COVID-19) pandemic.
- Organization
- Asian Development Bank
- Budget
- USD 250.0M
- Timeline
- Jun 1, 2020 → Nov 30, 2021
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - active
Electricity Grid Modernization Project
100%data completenessThe project will finance high-priority electricity grid modernization investments both in transmission and distribution system in Nepal under the following outputs: Output 1: Electricity transmission capacity in project areas strengthened and modernized. Output 2: Electricity distribution system in project areas modernized. Output 3: Capacity of NEA and electricity users in project areas strengthened. These outputs will result in the following outcome: access to efficient grid electricity supply in Nepal improved. The project will be aligned with the following impact: investments in industrial and commercial hubs promoted.
- Organization
- Asian Development Bank
- Budget
- USD 60.0M
- Timeline
- Nov 26, 2021 → Sep 30, 2026
- Coverage
- Morang, Dhading
Complete record·2 sources·Funded by Asian Development Bank - active
South Asia Subregional Economic Cooperation Electricity Transmission and Distribution Strengthening Project
85%data completenessThe proposed project will address the limitations of the grid infrastructure in Nepal in meeting the growing domestic electricity demand and green electricity export aspirations. It will finance some of the high-priority components of Nepal's transmission and distribution master plans to improve electricity evacuation from domestic hydropower plants and deliver electricity to domestic demand centers, and to transmission hubs for cross-border electricity trade.
- Organization
- Asian Development Bank
- Budget
- USD 10.0M
- Timeline
- Dec 20, 2024 → May 31, 2033
- Coverage
- Nepal
Complete record·4 sources·Funded by Asian Development Bank - active
Rural Enterprise Financing Project
100%data completenessThe project will promote and finance commercial agribusiness enterprises collective owned by small farmers (collective enterprises) and individual small enterprises (individual enterprises) through Small Farmers Development Bank (SFDB), an apex development bank owned by Small Farmers Agriculture Cooperatives (SFACs). SFDB provides wholesale loans to SFACs; then SFACs relend to their small famer members. Under the project, SFACs will relend the loan proceeds to their members' collective enterprises and individual enterprises.
- Organization
- Asian Development Bank
- Budget
- USD 50.0M
- Timeline
- Dec 10, 2019 → Jun 30, 2025
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - completed
Priority River Basins Flood Risk Management Project
95%data completenessThe priority river basins flood risk management project will improve the resilience of communities to flooding in six river basins in the Terai region in Nepal. It is in line with Nepal's National Water Plan, 2002-2027 to reduce social and economic losses from water-induced disasters through blending structural and nonstructural measures. The project will protect agricultural land and households in priority areas from a 1-in-50-year return period flood by constructing flood embankments, spurs, and outlet structures. The local response to flooding will be strengthened through the development installation of flood forecasting and early warning systems (FFEWSs) and community-based disaster risk management (CBDRM).
- Organization
- Asian Development Bank
- Budget
- USD 750K
- Timeline
- Oct 23, 2020 → Jun 30, 2026
- Coverage
- Nepal
Complete record·3 sources·Funded by Asian Development Bank - active
Mechanized Irrigation Innovation Project
95%data completenessThe project will provide long-term sustainable solutions to increase year-round access to irrigation water in about 22,400 hectares (ha) of command area in Rautahat and Sarlahi districts of Madhesh Province in the Terai. This will provide increased climate resilience and water security to poor rural farmers by constructing a large-scale network of about 500 deep tube wells (DTWs) with dedicated and reliable electricity distribution networks. The management, operation, and maintenance (MOM) of the tube well irrigation schemes will be contracted to a third-party operator, using a design-build-operate (DBO) contracting modality. On-demand irrigation services will be provided to at least 121,000 farmers using innovative technology with a prepaid water metering system. The project will be the first of its kind in Nepal and will transition from traditional irrigation systems toward a more resilient and sustainable irrigation system.
- Organization
- Asian Development Bank
- Budget
- USD 110.0M
- Timeline
- Dec 11, 2024 → Oct 9, 2030
- Coverage
- Rautahat, Sarlahi
Complete record·2 sources·Funded by Asian Development Bank - active
SASEC Highway Enhancement Project (Laukahi-Kakarbhitta)
100%data completenessThe project road is a two-lane carriageway and carries about 14,000 vehicles per day. Traffic is forecast to reach 48,800 vehicles per day by 2041. The road will be median-divided and provides service lanes, footpath, and cycle lane in urban areas. Through the project, the road will be upgraded to a two-lane dual carriageway to accommodate the increasing traffic demand, with improved geometry, pavement, drainage, road safety, and climate- and disaster-resilient features. Grade separation or traffic signal will be adopted at junctions to improve safety for vulnerable road users including women and children who are more likely to walk, cycle or use public transport. River training and bank protection works will minimize the risk of erosion. The project design incorporates lessons from previous projects, including readiness, procurement, asset management and sustainability. The project will be aligned with the following impact: balanced and diversified international trade route promoted and economic interconnectivity improved. The project will have the following outcome: connectivity, capacity, efficiency, and safety of the road transport system along the EWH improved.
- Organization
- Asian Development Bank
- Budget
- USD 300.0M
- Timeline
- Jul 7, 2023 → Dec 31, 2029
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - active
South Asia Subregional Economic Cooperation Mugling-Pokhara Highway Improvement Phase 1 Project
100%data completenessThe project road is the primary access link of Pokhara to Kathmandu and is a major feeder road of two SASEC corridors linking Kathmandu to Dhaka (Bangladesh) and Kolkata (India) through Mugling and the East-West Highway. It is a two-lane carriageway that handles about 7,400 vehicles per day, including 14% of goods vehicles and up to 55% of motorcycles in urban areas. Traffic is forecast to increase to 13,000 vehicles per day by 2040, and the rising number of motorcycles creates significant road safety risks, notably as (i) the road winds through the mid-hill region of Nepal and its geometry can be improved, (ii) slow-moving vehicles and pedestrians are not segregated in urban areas, and (iii) the pavement is in poor condition. The road will be widened to four lanes to cater to increasing demand, and design standards will feature enhanced geometry, pavement, structure, drainage, safety, and intelligent traffic system features to improve sustainability, safety awareness, and safety compliance. The road will be median divided, and service lanes in urban areas will improve safety, particularly for women and children, who are more likely to walk, ride a bicycle, or use public transport than men.
- Organization
- Asian Development Bank
- Budget
- USD 195.0M
- Timeline
- Dec 10, 2019 → Jun 30, 2026
- Coverage
- Kathmandu, Kaski
Complete record·1 source·Funded by Asian Development Bank - active
South Asia Subregional Economic Cooperation Highway Improvement Project
100%data completenessThe project will support capacity, quality, and safety improvements of the East-West Highway (EWH), which is the main domestic and international trade corridor of Nepal, and which forms part of the South Asian Association for Regional Cooperation (SAARC) corridor 4 linking Kathmandu to Dhaka and Chittagong through India. The project will (i) rehabilitate and widen about 87 kilometers (km) of the EWH between Kanchanpur and Kamala in southeastern Nepal; (ii) improve road safety, asset management, and gender equality and social inclusion (GESI) on the 1,027 km EWH; and (iii) strengthen the road safety and GESI capacity of road sector agencies. The project will promote economic growth and contribute to improving the competitiveness of Nepal's exporting industries by enhancing the efficiency of the transport system, strengthening national and regional connectivity, and improving the safety of the road network.
- Organization
- Asian Development Bank
- Budget
- USD 180.0M
- Timeline
- Nov 20, 2018 → Jun 30, 2024
- Coverage
- Kathmandu, Kanchanpur
Complete record·1 source·Funded by Asian Development Bank - active
Disaster Resilience of Schools Project
100%data completenessThe impact of the Project will be enhanced disaster risk management for human resources development (Post Disaster Recovery Framework and School Sector Development Plan) . The outcome will be disaster resilience of schools and communities increased and learning environment improved. The outputs will be (a) heavily damaged schools reconstructed and improved; (b) unsafe schools retrofitted and disaster risk reduced; and (c) institutional capacity for disaster resilience strengthened.
- Organization
- Asian Development Bank
- Budget
- USD 148.9M
- Timeline
- Nov 20, 2018 → Mar 31, 2023
- Coverage
- Nepal
Complete record·3 sources·Funded by Asian Development Bank - completed
South Asia Subregional Economic Cooperation Customs Reform and Modernization for Trade Facilitation Program
90%data completenessThe program will support the simplification, harmonization, and modernization of Nepal's trade processes to meet international standards. This will contribute to Nepal's national goals of promoting and diversifying exports, and help the country fulfill its commitments to the Trade Facilitation Agreement (TFA) of the World Trade Organization (WTO) and related international standards on customs.
- Organization
- Asian Development Bank
- Budget
- USD 21.0M
- Timeline
- Sep 10, 2017 → Mar 4, 2020
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - active
South Asia Subregional Economic Cooperation Power Transmission and Distribution System Strengthening Project
90%data completenessThe Asian Development Bank (ADB) will provide a loan to the Government of Nepal (the government) to (a) upgrade 220/132 kilovolt (kV) substations to 400/220/132 kV substations to enable electricity generated from independent power producer (IPPs) plants in the Khimti hydropower corridor to be exported to India; (b) construction of three 132/11 kV substations in Teku, Koteshwor, and Thapathali which will increase supply capacity into the Kathmandu Valley; (c) modernizing and reinforcing four distribution centers around Kathmandu Valley to be able to meet increasing domestic demand for electricity; and (d) construction of 33 kV, 11 kV, and 0.4 kV lines and substations to facilitate connection of approximately 150,000 new customers in Nepal's Province 2 in the country's southeast region The proposed project complements the efforts of Millennium Challenge Corporation (MCC) to strengthen parts of Nepal's high-voltage transmission network and complete Nepal's portion of the second cross-border transmission line with India for increasing electricity trade.
- Organization
- Asian Development Bank
- Budget
- USD 200.0M
- Timeline
- Aug 27, 2020 → Jun 30, 2026
- Coverage
- Kathmandu, Bagmati
Complete record·1 source·Funded by Asian Development Bank - active
Power Transmission and Distribution Efficiency Enhancement Project
100%data completenessElectricity is a necessary requirement for accelerating the economic development of any country and is considered an important input to improve quality of life. Overall, the electricity demand has far outgrown the supply, leading to load curtailment and increased dependence on imports from India in recent times. The peak suppressed demand in Nepal in FY2013-2014 has been around 1,200 megawatt (MW) as against installed capacity of 787 MW, hence resulting in a deficit of about 440 MW due to non-availability of generation. Government has plans to generate additional 10,000 MW in the next 10 years. About 63% of the population in Nepal has access to electricity but the supply quality is unreliable and inadequate. The government has recognized the immediate need for reinforcement and upgrade of outdated distribution systems crucial to deliver the required energy to the customers even if the generation and transmission lines are in place. In this regard, the need for immediate distribution network enhancement is included in the government's action plan to address energy crisis and provide universal access to reliable and efficient electricity for all by 2030. This will contribute in promoting sustainable energy for all (Sustainable Development Goal #7) and Nepal's Intended Nationally Determined Commitments for the United Nations Framework Convention on Climate Change. ADB's Nepal country partnership strategy 2013-2017 supports the government's development objective of accelerated and inclusive economic growth. It seeks to address the infrastructure bottlenecks in the key areas such as energy services and creating an enabling environment for increased business and employment opportunities. ADB's support for the energy sector in Nepal has largely focused on generation and transmission with some distribution extension. This project will be ADB's first investment in Nepal specifically targeting energy efficiency through distribution system enhancements measures.
- Organization
- Asian Development Bank
- Budget
- USD 150.0M
- Timeline
- Sep 10, 2017 → Jun 30, 2022
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - active
Supporting the School Education Sector Plan
95%data completenessThe results-based lending (RBL)program will assist the Government of Nepal in reforming the school education system through the implementation of its School Education Sector Plan (SESP) in a sector-wide approach (SWAp) supported by eight development partners, including the Asian Development Bank (ADB). The RBL program will strengthen equity, quality, and resilience of school education by helping the government (i) enhance learning provisions for basic and secondary schools; (ii) strengthen teaching and learning in basic and secondary schools; (iii) accelerate the recovery from learning losses caused by the coronavirus disease (COVID-19) pandemic; and (iv) improve the capacity of governments, especially local governments, for education planning, monitoring, and reporting.
- Organization
- Asian Development Bank
- Budget
- USD 1.0M
- Timeline
- Dec 31, 2022 → Dec 31, 2027
- Coverage
- Nepal
Complete record·2 sources·Funded by Asian Development Bank - completed
Supporting School Sector Development Plan
95%data completenessThe program will support the School Sector Development Plan (SSDP), which is the government's major education initiative for FY2017-FY2023. The Asian Development Bank (ADB) and eight other joint financing partners (JFPs) will finance the program with the government during FY2017-FY2021 through a sector-wide approach.
- Organization
- Asian Development Bank
- Budget
- USD 4.7M
- Timeline
- Apr 9, 2018 → Sep 19, 2023
- Coverage
- Nepal
Complete record·2 sources·Funded by Asian Development Bank - completed
Earthquake Emergency Assistance Project
100%data completenessThrough this project, the Asian Development Bank will support the Government of Nepal in its efforts to put thousands of children back into schools, return vital government services to desperate communities, and create jobs and income for families by repairing critical road networks. The project will rebuild or repair least 700 schools damaged by the earthquake. The schools that are rebuilt or repaired under the project will include stronger construction and engineering specifications that are designed to help the structures withstand future disasters. They will also include improved bathrooms with separate facilities for boys and girls. As part of the project, disaster risk management principles and awareness will be developed in the communities surrounding the refurbished schools. To get vital social services to the people as quickly as possible, transitional government offices will be established while disaster-resistant structures are being built and furnished. The project will also repair and improve about 135 km of strategic roads and about 450 km of rural roads damaged by the earthquake and landslides. The roads will be rebuilt with improved road safety features and designed to withstand future disasters and the impact of climate change. The long term outcome of the work being done under the project is the construction of roads, schools and government buildings that are designed to withstand the disasters of the future. This will speed up the social and economic recovery of communities devastated by the earthquake.
- Organization
- Asian Development Bank
- Budget
- USD 200.0M
- Timeline
- Aug 21, 2015 → Jul 7, 2020
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - completed
Nepal Earthquake Disaster Response Humanitarian Assistance
95%data completenessA powerful 7.8 magnitude earthquake struck Nepal on 25 April 2015, with the epicenter in Lamjung District (north-west) of Kathmandu. As of 26 April 2015, the death toll stands at over 2,288 people and the injured at more than 5,850 people, but observers believe these numbers are likely to increase. A United Nations situation report confirms that 30 out of 75 districts in the country have been affected in the Western and Central Regions, including Kathmandu Valley districts. This includes mountainous and hilly areas, in areas where rural populations are dispersed, as well as some very densely populated districts and Nepal?s two largest cities?greater Kathmandu and Pokhara. The worst affected districts include Sindulpalchowk, Kavre, Nuwakot, Rasuwa, and Dolakha in the central region; and Kaski, Gorkha, and Lamjung in the western region. The impacts of the earthquake and its aftershocks in the Kathmandu Valley include collapsed historic buildings in the center of Kathmandu. Roads and other infrastructure have been severely affected, and the delivery of relief goods and services has become difficult. The residents are already facing serious shortages of food, water, and other essential items. Many houses in the worst affected areas are believed to have collapsed. The majority of the populations remain outside their houses due to fear of aftershocks and structural damage to buildings. The Nepalese media report that stores are running out of food and especially water. Hospitals are overcrowded and running short on emergency medical supplies. Doctors from hospitals are reported to be treating people in the streets. The Government of Nepal (Government) declared a state of emergency for the 11 affected districts on the evening on 25 April 2015 and has requested international assistance, particularly for the most critical humanitarian needs of the population. This includes (i) search and rescue capacity; (ii) medical teams, supplies, tenting for hospitals, and body bags for the dead; (iii) heavy equipment for removal of rubble; and (iv) helicopters for transport and access to blocked areas.
- Organization
- Asian Development Bank
- Budget
- USD 3.0M
- Timeline
- Apr 29, 2015 → May 23, 2016
- Coverage
- Dolakha, kabhrepalanchok
Complete record·1 source·Funded by Asian Development Bank - active
Upper Trishuli-1 Hydropower Project
80%data completenessThe project comprises the design, construction, commissioning, operation and maintenance of a 216 MW run-of-river hydro power plant, 1.2 kilometers of transmission lines, and associated infrastructure on the Trishuli River. The electricity generated will be sold for domestic consumption to the Nepal Electricity Authority.
- Organization
- Asian Development Bank
- Budget
- USD 30.0M
- Timeline
- Oct 28, 2019 → End not reported
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - active
South Asia Subregional Economic Cooperation Roads Improvement Project
90%data completenessThe project will rehabilitate and upgrade in terms of capacity, quality, and safety, about 160 kilometers (km) of Nepal's strategic road network, which comprise a critical section of the country's main East-West highway and its feeder road. It will improve transport connectivity in Nepal, with a focus on providing faster and better access to social services and economic opportunities. The project roads are also integral to the international and regional road network system that connects Nepal to India, and will facilitate closer trade integration and contribute to Nepal's export competitiveness. The project will have a transformational impact by facilitating national and regional integration.
- Organization
- Asian Development Bank
- Budget
- USD 186.8M
- Timeline
- Jan 18, 2017 → Jul 31, 2022
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - active
Rural Connectivity Improvement Project - Additional Financing
90%data completenessThe overall project is estimated to cost $255.72 million, including additional financing of $120.00 million, of which ADB is providing a concessional loan of $100.00 million from ADB's ordinary capital resources. The government will finance $20.00 million of the proposed additional financing project. The attached TA is estimated to cost $1.00 million, which will be financed on a grant basis by ADB's Technical Assistance Special Fund. The impact and outcome of the overall project will remain unchanged from those of the ongoing project. The proposed additional financing will scale up the current output 1 by an additional 324 km of rural roads and output 2 by increasing capacity support to fulfill the roles and responsibilities in a federal system.
- Organization
- Asian Development Bank
- Budget
- USD 100.0M
- Timeline
- Oct 31, 2023 → Sep 30, 2028
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - completed
Food Safety and Agriculture Commercialization Program
100%data completenessThe program is aligned with ADB's Strategy 2030, specifically the operational priorities on promoting rural development and food security and strengthening governance and institutional capacity. Moreover, the government's 14th periodic plan (FY2016/2017-FY2018/2019), 15th five-year plan (FY2019/2020-FY2023/2024), and Envisioning Nepal 2030 have highlighted the modernization and commercialization of agriculture sector as a national development priority in the country's aspiration to attain middle-income status by 2030. The ADB-assisted Agriculture Development Strategy (ADS), 2015-2035 provides the government's 20-year strategic direction for the agriculture sector in Nepal, with a vision for a self-reliant, sustainable, competitive, and inclusive agriculture sector. The program aligns well with the four ADS outcomes: (i) improved governance, with measures such as improving the credibility of policy commitment; (ii) higher productivity, with activities for improving quality and availability of key inputs and extension services; (iii) profitable commercialization, with measures such as improving value-chain linkages; and (iv) increased competitiveness through increase in agricultural exports, and food safety and security, among others.
- Organization
- Asian Development Bank
- Budget
- USD 50.0M
- Timeline
- Dec 10, 2019 → Jan 20, 2023
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - active
Nuts and Fruits in Hilly Areas Project
100%data completenessThe project will increase agricultural income of approximately 40,000 farm households in 100 municipalities in hilly areas of five provinces: Province 1, Bagmati, Gandaki, Karnali and Sudurpashchim. This will be mainly achieved through the development of approximately 10,000 hectares (ha) of climate resilient fruit and nut orchards providing value-addition to the nuts and fruits produced by at least 30,000 farm households. The project will also improve the institutional capacity for managing the nursery and horticulture sector. For about 10,000 smallholder households, who are not capable of investing in fruit and nut orchard development in the project provinces, the project will assist them to improve their vegetable and other nutritious crop production and its marketing.
- Organization
- Asian Development Bank
- Budget
- USD 60.0M
- Timeline
- Nov 7, 2022 → Feb 28, 2030
- Coverage
- Koshi, Bagmati
Complete record·3 sources·Funded by Asian Development Bank