SASEC Highway Enhancement Project (Laukahi-Kakarbhitta)
The project road is a two-lane carriageway and carries about 14,000 vehicles per day. Traffic is forecast to reach 48,800 vehicles per day by 2041. The road will be median-divided and provides service lanes, footpath, and cycle lane in urban areas. Through the project, the road will be upgraded to a two-lane dual carriageway to accommodate the increasing traffic demand, with improved geometry, pavement, drainage, road safety, and climate- and disaster-resilient features. Grade separation or traffic signal will be adopted at junctions to improve safety for vulnerable road users including women and children who are more likely to walk, cycle or use public transport. River training and bank protection works will minimize the risk of erosion. The project design incorporates lessons from previous projects, including readiness, procurement, asset management and sustainability. The project will be aligned with the following impact: balanced and diversified international trade route promoted and economic interconnectivity improved. The project will have the following outcome: connectivity, capacity, efficiency, and safety of the road transport system along the EWH improved.
Overview
About this project
The project road is a two-lane carriageway and carries about 14,000 vehicles per day. Traffic is forecast to reach 48,800 vehicles per day by 2041. The road will be median-divided and provides service lanes, footpath, and cycle lane in urban areas. Through the project, the road will be upgraded to a two-lane dual carriageway to accommodate the increasing traffic demand, with improved geometry, pavement, drainage, road safety, and climate- and disaster-resilient features. Grade separation or traffic signal will be adopted at junctions to improve safety for vulnerable road users including women and children who are more likely to walk, cycle or use public transport. River training and bank protection works will minimize the risk of erosion. The project design incorporates lessons from previous projects, including readiness, procurement, asset management and sustainability. The project will be aligned with the following impact: balanced and diversified international trade route promoted and economic interconnectivity improved. The project will have the following outcome: connectivity, capacity, efficiency, and safety of the road transport system along the EWH improved.
Record quality
100% complete
Core project fields are present in the source-backed record.
Report an update or correctionProgress
31%- Plan
- Implementation
- Outcomes
Alignment