South Asia Subregional Economic Cooperation Power Transmission and Distribution System Strengthening Project

The Asian Development Bank (ADB) will provide a loan to the Government of Nepal (the government) to (a) upgrade 220/132 kilovolt (kV) substations to 400/220/132 kV substations to enable electricity generated from independent power producer (IPPs) plants in the Khimti hydropower corridor to be exported to India; (b) construction of three 132/11 kV substations in Teku, Koteshwor, and Thapathali which will increase supply capacity into the Kathmandu Valley; (c) modernizing and reinforcing four distribution centers around Kathmandu Valley to be able to meet increasing domestic demand for electricity; and (d) construction of 33 kV, 11 kV, and 0.4 kV lines and substations to facilitate connection of approximately 150,000 new customers in Nepal's Province 2 in the country's southeast region The proposed project complements the efforts of Millennium Challenge Corporation (MCC) to strengthen parts of Nepal's high-voltage transmission network and complete Nepal's portion of the second cross-border transmission line with India for increasing electricity trade.

Source-reported status: active. Timeline labels use reported dates and do not verify current activity.

Save
USD 200.0M budget·USD 116.9M disbursed·Asian Development Bank reporting organization·Kathmandu, Bagmati location·Aug 27, 2020 → Jun 30, 2026 timeline

Reported by Asian Development Bank

Overview

About this project

The Asian Development Bank (ADB) will provide a loan to the Government of Nepal (the government) to (a) upgrade 220/132 kilovolt (kV) substations to 400/220/132 kV substations to enable electricity generated from independent power producer (IPPs) plants in the Khimti hydropower corridor to be exported to India; (b) construction of three 132/11 kV substations in Teku, Koteshwor, and Thapathali which will increase supply capacity into the Kathmandu Valley; (c) modernizing and reinforcing four distribution centers around Kathmandu Valley to be able to meet increasing domestic demand for electricity; and (d) construction of 33 kV, 11 kV, and 0.4 kV lines and substations to facilitate connection of approximately 150,000 new customers in Nepal's Province 2 in the country's southeast region The proposed project complements the efforts of Millennium Challenge Corporation (MCC) to strengthen parts of Nepal's high-voltage transmission network and complete Nepal's portion of the second cross-border transmission line with India for increasing electricity trade.

Field coverage

90% complete

1 source feed · 2 evidence versions

Completeness measures the presence of project fields. It is not a verification score. Multiple evidence versions can come from the same feed, and feeds can reproduce the same publisher's data.

Not reported by the available sources: sectors. This is intentionally shown as unavailable rather than estimated.

Report an update or correction

Reported disbursement / budget

58.5%

USD 116.9M reported disbursed against USD 200.0M reported budget. This financial ratio does not measure implementation or outcomes.

Provenance

Original project evidence

1 distinct source feed across 2 recorded evidence versions. These are not independent confirmations. Links below show the latest available version for each source page, up to 50 pages.

  • iati ↗

    https://d-portal.org/ctrack.html?aid=XM-DAC-46004-50059-003-LN3943

    Retrieved Oct 27, 2026 · Last checked Oct 27, 2026

Alignment

SDG focus

No SDGs tagged.