Upper Trishuli-1 Hydropower Project

The project comprises the design, construction, commissioning, operation and maintenance of a 216 MW run-of-river hydro power plant, 1.2 kilometers of transmission lines, and associated infrastructure on the Trishuli River. The electricity generated will be sold for domestic consumption to the Nepal Electricity Authority.

Source-reported status: active. Timeline labels use reported dates and do not verify current activity.

Save
USD 30.0M budget·USD 20.1M disbursed·Asian Development Bank reporting organization·Nepal location·Oct 28, 2019 → End not reported timeline

Reported by Asian Development Bank

Overview

About this project

The project comprises the design, construction, commissioning, operation and maintenance of a 216 MW run-of-river hydro power plant, 1.2 kilometers of transmission lines, and associated infrastructure on the Trishuli River. The electricity generated will be sold for domestic consumption to the Nepal Electricity Authority.

Field coverage

90% complete

1 source feed · 2 evidence versions

Completeness measures the presence of project fields. It is not a verification score. Multiple evidence versions can come from the same feed, and feeds can reproduce the same publisher's data.

Not reported by the available sources: end date. This is intentionally shown as unavailable rather than estimated.

Report an update or correction

Reported disbursement / budget

67.0%

USD 20.1M reported disbursed against USD 30.0M reported budget. This financial ratio does not measure implementation or outcomes.

Provenance

Original project evidence

1 distinct source feed across 2 recorded evidence versions. These are not independent confirmations. Links below show the latest available version for each source page, up to 50 pages.

  • iati ↗

    https://d-portal.org/ctrack.html?aid=XM-DAC-46004-49086-001-LN3781

    Retrieved Oct 27, 2026 · Last checked Oct 27, 2026

Alignment

SDG focus

No SDGs tagged.