completed· Disaster Risk· Climate· WASH

Priority River Basins Flood Risk Management Project

The priority river basins flood risk management project will improve the resilience of communities to flooding in six river basins in the Terai region in Nepal. It is in line with Nepal's National Water Plan, 2002-2027 to reduce social and economic losses from water-induced disasters through blending structural and nonstructural measures. The project will protect agricultural land and households in priority areas from a 1-in-50-year return period flood by constructing flood embankments, spurs, and outlet structures. The local response to flooding will be strengthened through the development installation of flood forecasting and early warning systems (FFEWSs) and community-based disaster risk management (CBDRM).

Save
USD 750K budget·Not reported disbursed·Asian Development Bank implementer·Nepal location·Oct 23, 2020 → Jun 30, 2026 timeline

Overview

About this project

The priority river basins flood risk management project will improve the resilience of communities to flooding in six river basins in the Terai region in Nepal. It is in line with Nepal's National Water Plan, 2002-2027 to reduce social and economic losses from water-induced disasters through blending structural and nonstructural measures. The project will protect agricultural land and households in priority areas from a 1-in-50-year return period flood by constructing flood embankments, spurs, and outlet structures. The local response to flooding will be strengthened through the development installation of flood forecasting and early warning systems (FFEWSs) and community-based disaster risk management (CBDRM).

Record quality

95% complete

3 sources · confidence 65%

Not reported by the available sources: disbursement. This is intentionally shown as unavailable rather than estimated.