Public project record · Nepal
Development projects in Nepal
Explore projects reported by development organizations, donors, and public sources. Every record shows what is known, what is not reported, and where the evidence comes from.
- completed
Nepal Earthquake 2015 - Deployment of Emergency Relief Items – Canadian Red Cross
95%data completenessMay 2015 - On 25 April, a magnitude 7.8 earthquake hit Nepal, with the epicentre 81 km northwest of Kathmandu. The earthquake has affected over 8 million people, displaced 2.8 million, and has left more than 3.5 million Nepalese in need of food assistance. On 12 May, a 7.3 magnitude earthquake struck Nepal, northeast of Kathmandu, and near its border with China. This aftershock caused additional damage and loss of life, including throughout many areas already impacted by the April 25 earthquake. In response to the crisis, DFATD is deploying emergency relief items from its stockpile, managed by the Canadian Red Cross, to help meet the immediate needs of up to 25,000 affected people. The relief items are being provided to those who are most in need, in coordination with the Government of Nepal and the wider humanitarian community. The relief items include: (1) tents and tarpaulins to help provide temporary shelter; and (2) basic household items such as blankets, kitchen sets, and hygiene kits (which include items such as soap and toothbrushes), as well as jerry cans and buckets to safely transport water.
- Organization
- Global Affairs Canada
- Budget
- USD 2.6M
- Timeline
- Aug 20, 2015 → Mar 31, 2016
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Nepal Earthquake Emergency Response 2015 – OCHA
95%data completenessMay 2015 – On 25 April, an earthquake of 7.8 magnitude hit Nepal near the capital city of Kathmandu. The government has reported that 30 out of 75 districts are affected in the Western and Central Regions, including districts in Kathmandu Valley. The epicentre is located 81 km northwest of Kathmandu. A number of large aftershocks have occurred since the first earthquake. To date, over 5,000 deaths have been confirmed and over 11,000 people have been injured. These figures are expected to increase as more information becomes available. With DFATD's support and that of other donors, the United Nations Office for the Coordination of Humanitarian Affairs (OCHA) is providing essential coordination support for the humanitarian response in Nepal. Project activities include: (1) providing assessments, analysis, information management and coordination assistance to support the Government of Nepal’s response to the disaster; (2) providing coordination support to local, national and international humanitarian organizations; (3) providing information to affected populations on the response efforts to improve their ability to access help; and (4) collecting feedback from affected communities to ensure their experience informs the wider humanitarian response.
- Organization
- Global Affairs Canada
- Budget
- USD 205K
- Timeline
- May 12, 2015 → Dec 31, 2015
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Nepal Earthquake Emergency Response 2015 - World Vision Canada
95%data completenessApril 2015 – Le 25 avril, un séisme de magnitude 7,8 a frappé le Népal près de Katmandou, la capitale. Le gouvernement a indiqué que 30 districts sur 75 sont touchés dans les régions de l’Ouest et du Centre, y compris les districts de la vallée de Katmandou. L’épicentre est situé à 81 km au nord-ouest de Katmandou. Un certain nombre de répliques importantes se sont produites depuis le premier séisme. À ce jour, plus de 3 000 décès ont été confirmés et plus de 6 000 personnes ont été blessées. On s’attend à ce que ces chiffres augmentent à mesure que de l’information additionnelle sera disponible. Avec le soutien du MAECD, Vision mondiale Canada aide à répondre aux besoins des personnes touchées par le séisme en matière d’abris, de fournitures de secours d’urgence et de protection. Parmi les activités du projet : 1) la fourniture d’abris d’urgence, y compris des tentes, des nattes et des couvertures aux familles touchées; 2) la distribution d’articles de secours d’urgence aux familles, y compris des vêtements chauds, des lanternes tempête et du savon; 3) la mise en place de six espaces adaptés aux enfants; 4) la fourniture de services de soutien psychosocial et d’aiguillage pour les enfants.
- Organization
- Global Affairs Canada
- Budget
- USD 369K
- Timeline
- May 1, 2015 → Nov 30, 2015
- Coverage
- Nepal
Complete record·1 source - completed
Nepal Earthquake – Emergency Response 2015 – Emergency Field Hospital – Canadian Red Cross
95%data completenessMay 2015 – On 25 April, an earthquake of 7.8 magnitude hit Nepal near the capital city of Kathmandu. The government has reported that 30 out of 75 districts are affected in the Western and Central Regions, including districts in Kathmandu Valley. The epicentre is located 81 km northwest of Kathmandu. A number of large aftershocks have occurred since the first earthquake. To date, over 3,000 deaths have been confirmed and over 6,000 people have been injured. These figures are expected to increase as more information becomes available. With DFATD’s support, the Canadian Red Cross (CRC) is helping to meet the life-saving health needs of up to 50,000 people affected by the earthquake. Relief activities include: (1) deploying a basic health care unit with surgical and obstetric care capacity; and (2) providing mobile health care, including vaccinations, rehydration, and mother and child care for up to 200 people per day.
- Organization
- Global Affairs Canada
- Budget
- USD 820K
- Timeline
- May 1, 2015 → Oct 31, 2015
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Nepal Earthquake Emergency Response 2015 - Oxfam Canada
95%data completenessApril 2015 – On 25 April, an earthquake of 7.8 magnitude hit Nepal near the capital city of Kathmandu. The government has reported that 30 out of 75 districts are affected in the Western and Central Regions, including districts in Kathmandu Valley. The epicentre is located 81 km northwest of Kathmandu. A number of large aftershocks have occurred since the first earthquake. To date, over 3,000 deaths have been confirmed and over 6,000 people have been injured. These figures are expected to increase as more information becomes available. With DFATD's support, Oxfam Canada is helping to meet emergency water, hygiene, sanitation, and relief supplies needs of people affected by the earthquake. Project activities include: (1) providing safe drinking water; (2) providing sanitation facilities and hygiene promotion at health facilities; and (3) distributing emergency relief supplies, including blankets, water containers and cooking items.
- Organization
- Global Affairs Canada
- Budget
- USD 243K
- Timeline
- Apr 30, 2015 → Jul 31, 2015
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Nepal Earthquake - Emergency Response 2015 - CECI
95%data completenessMay 2015 - On April 25, a magnitude 7.8 earthquake hit Nepal, with the epicentre 81 km northwest of Kathmandu. The earthquake has affected over 8 million people, displaced 2.8 million, and has left more than 3.5 million Nepalese in need of food assistance. To date, the Government of Nepal has confirmed over 8,600 deaths and 16,800 injured. On May 12, a 7.3 magnitude earthquake struck Nepal, northeast of Kathmandu, and near its border with China. This aftershock caused additional damage and loss of life, including throughout many areas already impacted by the April 25 earthquake. With DFATD's support, the Centre for International Studies and Cooperation (CECI) is helping to meet the water, sanitation, hygiene and shelter needs, and support the livelihoods of up to 25,000 people affected by the earthquake. Project activities include: (1) distributing emergency shelter kits; (2) providing emergency relief supplies and water, sanitation, and hygiene (WASH) items; (3) providing psychosocial support and referral services; and (4) training to households on livestock and agriculture management.
- Organization
- Global Affairs Canada
- Budget
- USD 567K
- Timeline
- Apr 30, 2015 → Feb 29, 2016
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Nepal Earthquake Emergency Response 2015 - Global Medic
95%data completenessApril 2015 – On 25 April, an earthquake of 7.8 magnitude hit Nepal near the capital city of Kathmandu. The government has reported that 30 out of 75 districts are affected in the Western and Central Regions, including districts in Kathmandu Valley. The epicentre is located 81 km northwest of Kathmandu. A number of large aftershocks have occurred since the first earthquake. To date, over 3,000 deaths have been confirmed and over 6,000 people have been injured. These figures are expected to increase as more information becomes available. With DFATD's support, Global Medic is helping to meet the emergency shelter, water, and protection needs of up to 5,000 families affected by the earthquake. Project activities include: (1) providing 30 tents to clinics, hospitals, schools and government buildings to replace damaged infrastructures; (2) providing psychosocial support and referral services for children; (3) distributing water purification units and hygiene kits; and (4) deploying Unmanned Aerial Vehicles (UAV) to map and assess damaged areas in need of humanitarian assistance.
- Organization
- Global Affairs Canada
- Budget
- USD 486K
- Timeline
- Apr 19, 2015 → Oct 31, 2015
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Nepal Earthquake - Emergency Response 2015 - CARE Canada
95%data completenessMay 2015 - On April 25, a magnitude 7.8 earthquake hit Nepal, with the epicentre 81 km northwest of Kathmandu. The earthquake has affected over 8 million people, displaced 2.8 million, and has left more than 3.5 million Nepalese in need of food assistance. To date, the Government of Nepal has confirmed over 8,600 deaths and 16,800 injured. On May 12, a 7.3 magnitude earthquake struck Nepal, northeast of Kathmandu, and near its border with China. This aftershock caused additional damage and loss of life, including throughout many areas already impacted by the April 25 earthquake. With DFATD's support, CARE Canada is helping to meet the emergency shelter, water, and hygiene needs of up to 10,000 earthquake affected people. Project activities include: (1) distribution of emergency shelter, household, and hygiene kits; (2) provision of household water containers and water treatment supplies (water purification solutions); and (3) delivery of hygiene promotion training.
- Organization
- Global Affairs Canada
- Budget
- USD 1.1M
- Timeline
- Apr 30, 2015 → Apr 30, 2016
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Nepal Earthquake Emergency Response 2015 - Save the Children Canada
95%data completenessApril 2015 – On 25 April, an earthquake of 7.8 magnitude hit Nepal near the capital city of Kathmandu. The government has reported that 30 out of 75 districts are affected in the Western and Central Regions including districts in Kathmandu Valley. The epicentre is located 81 km northwest of Kathmandu. A number of large aftershocks have occurred since the first earthquake. To date, over 3,000 deaths have been confirmed and over 6,000 people have been injured. These figures are expected to increase as more information becomes available. With DFATD's support, Save the Children Canada is helping to meet the emergency water, hygiene, and sanitation needs of people affected by the earthquake. Project activities include: (1) providing safe drinking water; (2) distributing hygiene kits; (3) repairing essential water and sanitation facilities; and (4) delivering community educational messages to promote good hygiene practices.
- Organization
- Global Affairs Canada
- Budget
- USD 486K
- Timeline
- Apr 30, 2015 → Dec 31, 2015
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Nepal Earthquake - Emergency Response 2015 - Samaritan’s Purse Canada
95%data completenessMay 2015 - On April 25, a magnitude 7.8 earthquake hit Nepal, with the epicentre 81 km northwest of Kathmandu. The earthquake has affected over 8 million people, displaced 2.8 million, and has left more than 3.5 million Nepalese in need of food assistance. To date, the Government of Nepal has confirmed over 8,600 deaths and 16,800 injured. On May 12, a 7.3 magnitude earthquake struck Nepal, northeast of Kathmandu, and near its border with China. This aftershock caused additional damage and loss of life, including throughout many areas already impacted by the April 25 earthquake. With DFATD's support, Samaritan’s Purse Canada is helping to meet the shelter, hygiene, and household items needs of up to 30,000 earthquake-affected people. Project activities include: (1) distribution of emergency relief supplies, including tarps, blankets, jerry cans, cooking kits, and hygiene items; and (2) distribution of emergency shelter kits and tools.
- Organization
- Global Affairs Canada
- Budget
- USD 1.1M
- Timeline
- Apr 30, 2015 → Oct 31, 2015
- Coverage
- Kathmandu, Bagmati
Complete record·1 source - completed
Swedish Mission Council frame 2017-2021
75%data completenessSMR has submitted an additional application for Sida grants for 2018-2019 in total 122,000,000 SEK. ADDITIONAL APPLICATION Prior to this agreement period, the Pentecostal Mission's development cooperation (PMU) has not been given renewed status as a framework organization at Sida and thus no longer receives direct support from the CSO grant. Instead, PMU, which is a member organization of SMR, has chosen to apply for grants for projects in support of civil society in developing countries from SMR, which pass on grants from the CSO grant. Prior to the current sub-agreement for the period 2017-2021, SMR has already received an offer from Sida to supplement it with an additional application for the period 2018-2019, which corresponds to SMR's assessment and recommendations for support to PMU. Subsequently, PMU has submitted to SMR with an application for a grant from SMR for the period 2018-2019. BUDGET SMR is applying for a total of SEK 122,000,000 for the two-year period 2018-2019, in addition to the already agreed amount of SEK 790,000,000. This is the same amount that the PMU applied for to SMR. SMR's total budget for the supplementary application 2018-2019 is SEK 134,551,400 (including SEK 12,551,400 in own contribution). The distribution between SMR, their Swedish member organizations and the local partners changes somewhat for the period to which the supplementary application relates. Based on the total budget for the supplementary application 2018-2019, the proportion staying with the Swedish member organizations increases from 13% to 19% and the proportion staying with the local partners decreases correspondingly from 81% to 75%. About 6% still stay with SMR. BASIS FOR PAGE ASSESSMENT The preparation has largely been based on SMR's input assessment of PMU's program application, but also SMR's organizational assessment of PMU and Sida's follow-up of SMR and PMU in Kenya, May 2017. Sida has also had access to PMU's program application to SMR, and the PMU's response to SMR's supplementary questions regarding the application. THE PREPARATION Since the intervention is prepared as a supplementary intervention decision, the preparation has, as far as possible, been based on the extensive preparation made of the application for the ongoing agreement period 2017-2021. As the assessment made of the application 2017-2021 is still relevant, this has been retained and supplementary comments regarding 2018-2019 have been added where the additional application causes an updated supplementary assessment. The revisions made by the committee therefore only affect the period 2018-2019.
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- Jan 1, 2017 → Apr 15, 2025
- Coverage
- Nepal
Good record·1 source - active
Girls Not Brides 2020 - 2026 - Girls Not Brides 2020 - 2022 (New strategy 2018-2022)
95%data completenessGNBs målsättning under deras nya strategiska plan för sekretariatet 2026-2030, är att 2030 ha bidragit till att förhindra att 7 miljoner flickor gifts bort innan de har fyllt 18 år. GNB avser att bidra till detta genom två ömsesidigt förstärkande strategier: 1. Globalt arbete för att säkerställa mer resurser och effektfulla politiska åtaganden. Säkerställa att barnäktenskap är prioriterat i internationella och sektorspecifika agendor samt värna existerande dedikerad finansiering och bidra till ökad resursmobilisering för arbetet mot barnäktenskap. GNB avser att säkerställa att målsättningar om att motverka barnäktenskap prioriteras i minst 3 internationella agendor, ramverk eller finansieringsmekanismer, och säkerställa åtaganden om minst 1 miljard USD i finansiering för arbete mot barnäktenskap. 2. Fokusering vad gällande resultat på landnivå för att påskynda framsteg. Genom investeringar i medlemsdrivna samarbetskoalitioner i prioriterade länder avser GNB bidra till förändrade maktstrukturer, stärkt lagstiftning, ökad implementering av befintliga lagar och policys, samt stödjande normförändringar. GNB avser att bidra till mätbara förbättringar vad gällande minskad förekomst av barnäktenskap i 10 utvalda länder. De två strategierna är ömsesidigt förstärkande: politiska åtaganden på regional och global nivå är en förutsättning för ökad finansiering av arbete som motverkar barnäktenskap, samt ansvarsutkrävande på nationell nivå. Framsteg på nationell nivå inspirerar och bidrar till best practices för likstämmiga länder samt är en förutsättning för politiskt engagemang och ledarskap på regional och global nivå. För att uppnå GNBs övergripande målsättning kommer organisationen att tillämpa fyra ömsesidigt beroende huvudsakliga taktiker: 1. Mobilisera rörelseaktörer som arbetar för att motverka barnäktenskap, kring gemensamma agendor, koordinerade strategier och delat inflytande. 2. Utrusta medlemmar, nationella koalitioner och andra relevanta förändringsaktörer med de verktyg och data som de behöver för att genomföra effektivt evidensbaserat arbete för att motverka barnäktenskap. 3. Påverka och bidra till politiskt engagemang på samtliga nivåer, kombinerat med systemförändringar på landnivå i de kontexter där det har bedömts finnas bäst förutsättningar. 4. Finansiera nationella medlemsledda koalitioner och värna (samt bidra till ökad) internationell finansiering för arbete mot barnäktenskap. För verksamhetsår 2026, vilket blir GNBs första år under den nya strategiska inriktningen, kommer fokus ligga på att ansvarsfullt fasa ut arbete som prioriterats i linje med föregående strategiska plan, och börja lägga grunden för den verksamhet som skall generera resultat under denna strategiperiod. Verksamheten som GNB avser att genomföra under 2026 förväntas bidra till följande exempel på resultat: - Etableringen av ett internationellt kollektiv av minst 10 framträdande ledarprofiler för arbete mot barnäktenskap som bidrar till politiska prioriteringar från minst åtta regeringar, samt stärkt samarbete med minst 10 ledande organisationer. - Hänförbara initiala resultat på landnivå i Malawi som GNBs första accelerator-land. Förväntade resultat är bland annat policyförbättringar, ökad inhemsk finansiering och implementering av den nationella strategin för att motverka barnäktenskap i minst två distrikt som ett resultat av Girls Not Brides Malawis arbete. - Framtagna genomförandeplaner för de resterande 9 prioriterade samarbetsländerna (Nigeria, Uganda, Kenya, Burkina Faso, Nepal, Bangladesh, Indien, Mexico och Colombia) med tidiga tecken på policyframsteg och stärkt kapacitet och ökad samordning hos de nationella GNB-koalitionerna. För verksamheten i Kenya, Uganda och Bangladesh förväntas följande resultat uppnås av verksamhet som genomförs 2026: Kenya - Ett effektivt, inflytelserikt och evidens-baserat civilsamhällesdeltagande i färdigställandet och lanseringen av Kenyas nationella strategi mot skadliga sedvänjor. - Ett stärkt nationellt partnerskap i Kenya (Girls Not Brides Kenya) som representerar 135 civilsamhällesorganisationer, som i utökad utsträckning kan driva gemensamt och koordinerat (mer effektfullt) påverkansarbete och utkräva ansvar gentemot ansvarsbärare i arbetet mot barnäktenskap. Uganda - Det nationella partnerskapet i Uganda (Girls Not Brides Uganda) som representerar 120 nationella medlemsaktörer och organisationer, har stärkts ekonomiskt och tekniskt för förbättrat ledarskap, kommunikation och effektivare påverkansarbete. - Stärkt evidens och lärande kring effektivt civilsamhällesdeltagande i genomförandet av Ugandas nationella strategi för att motverka barnäktenskap och ungdomsgraviditeter. Bangladesh - Ökad kunskap om huvudsakliga drivkrafter, geografiska utsattheter, rådande policyramverk och implementeringsgap samt möjligheter för accelererat arbete för att motverka barnäktenskap i Bangladesh. Utifrån denna kartläggning och analys, positionera det nationella partnerskapet i Bangladesh inför fördjupat arbete under resterande strategiperiod.
- Organization
- Sida / Sweden
- Budget
- USD 327K
- Timeline
- Jan 1, 2020 → Dec 31, 2027
- Coverage
- Nepal
Complete record·1 source - active
PDP IV – Innovative tools to address critical diagnostics gaps in low- and middle-income countries
100%data completenessThis project is implemented under the PDP IV programme by the Foundation for Innovative New Diagnostics (FIND). FIND's mission is to ensure equitable access to reliable diagnosis around the world, from early Research & Development (R&D) to implementation.
- Organization
- Netherlands Enterprise Agency
- Budget
- USD 835K
- Timeline
- Dec 1, 2022 → Dec 1, 2027
- Coverage
- Nepal
Complete record·1 source·Funded by Netherlands Enterprise Agency - completed
Swedish Mission Council frame 2017-2021 - Amendment for PMU 2020-2021
95%data completenessSMR has submitted an additional application for Sida grants for 2018-2019 in total 122,000,000 SEK. ADDITIONAL APPLICATION Prior to this agreement period, the Pentecostal Mission's development cooperation (PMU) has not been given renewed status as a framework organization at Sida and thus no longer receives direct support from the CSO grant. Instead, PMU, which is a member organization of SMR, has chosen to apply for grants for projects in support of civil society in developing countries from SMR, which pass on grants from the CSO grant. Prior to the current sub-agreement for the period 2017-2021, SMR has already received an offer from Sida to supplement it with an additional application for the period 2018-2019, which corresponds to SMR's assessment and recommendations for support to PMU. Subsequently, PMU has submitted to SMR with an application for a grant from SMR for the period 2018-2019. BUDGET SMR is applying for a total of SEK 122,000,000 for the two-year period 2018-2019, in addition to the already agreed amount of SEK 790,000,000. This is the same amount that the PMU applied for to SMR. SMR's total budget for the supplementary application 2018-2019 is SEK 134,551,400 (including SEK 12,551,400 in own contribution). The distribution between SMR, their Swedish member organizations and the local partners changes somewhat for the period to which the supplementary application relates. Based on the total budget for the supplementary application 2018-2019, the proportion staying with the Swedish member organizations increases from 13% to 19% and the proportion staying with the local partners decreases correspondingly from 81% to 75%. About 6% still stay with SMR. BASIS FOR PAGE ASSESSMENT The preparation has largely been based on SMR's input assessment of PMU's program application, but also SMR's organizational assessment of PMU and Sida's follow-up of SMR and PMU in Kenya, May 2017. Sida has also had access to PMU's program application to SMR, and the PMU's response to SMR's supplementary questions regarding the application. THE PREPARATION Since the intervention is prepared as a supplementary intervention decision, the preparation has, as far as possible, been based on the extensive preparation made of the application for the ongoing agreement period 2017-2021. As the assessment made of the application 2017-2021 is still relevant, this has been retained and supplementary comments regarding 2018-2019 have been added where the additional application causes an updated supplementary assessment. The revisions made by the committee therefore only affect the period 2018-2019.
- Organization
- Sida / Sweden
- Budget
- USD 376K
- Timeline
- Jan 1, 2017 → Apr 15, 2025
- Coverage
- Nepal
Complete record·1 source - completed
Humber Institute – Stages PSIJ 2015-2016
95%data completenessThis project is part of the Department of Foreign Affairs, Trade and Development (DFATD) International Youth Internship Program (IYIP), funded by the Government of Canada's Youth Employment Strategy (YES). The IYIP contributes to the YES by providing a large spectrum of Canadian graduates with valuable international development work experience abroad, needed to launch successful careers. Humber Institute Health and Private Sector Development project provides 20 interns with internships in ten countries: Bangladesh, Haiti, Ethiopia, Malawi, Tanzania, Bolivia, Burkina Faso, Peru, Nicaragua and Colombia. The interns work to address development challenges in relation to local needs by contributing to private sector development and health improvement by strengthening Food Security and Nutrition programming and Water and Sanitation projects.
- Organization
- Global Affairs Canada
- Budget
- USD 39K
- Timeline
- Aug 24, 2015 → Mar 31, 2016
- Coverage
- Nepal
Complete record·1 source - active
IFAD Financing Facility for Remittances
65%data completenessProgrammets mål är att: Maximera utvecklingseffekterna av migrantarbetares remitteringar och diasporans investeringar för att uppnå de globala målen. För att nå det övergripande målet har programmet fyra målsättningar: (i) Accelerera transformationen av remitteringsmarknader genom nyttjande av innovativa affärsmodeller och ny teknologi, för att generera större marknadseffektivitet och reducerade transaktionskostnader; (ii) Främja finansiell inkludering för att förse familjer som mottar remitteringar med fler valmöjligheter till att använda pengarna produktivt; (iii) Stötta mekanismer för diasporainvesteringar som riktar sig mot landsbygdsutveckling, sysselsättning och entreprenörskap; samt (iv) Öka den globala medvetenheten kring de positiva bidrag som migrantfamiljer gör i såväl mottagande- som avsändarländer och främja ny policy och nya partnerskap när utmaningar och möjligheter uppstår.
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- Jan 1, 2020 → Dec 31, 2027
- Coverage
- Nepal
Good record·1 source - active
Capacity development programme, Locally Controlled Forest Restoration (ITP+) - Locally controlled forest restoration (new strategy from 2024)
95%data completenessDet övergripande målet är att bidra till ökat kapacitet för lokalt administrerat skogsrestaurering i relevanta organisationer och inom ramen för Skogs- och landskapsrestaureringsprogram, som möjliggör för småbrukare och lokalsamhällen att restaurera degraderade skogslandskap och förvalta dessa hållbart. Detta förväntas på lång sikt bidra till ökade områden restaurerat och hållbart hanterat skogslandskap. På medellång sikt (outcome) förväntas programmet att bidra till förbättrade förvaltningsmekanismer där - deltagande organisationer och relevanta aktörer har en ökat förståelse och förmåga att främja affärsmöjligheter som leder till förbättrade ekosystemtjänster och försörjningsmöjligheter i samband med lokala Skogsrestaureringsinitiativ. - Multistakeholder-initiativ för lokalt administrerat Skogsrestaurering genomförs för transparent och hållbar förvaltning som möjliggör entrepreneurskap inom skogssektorn utifrån ett landskapsperspektiv och under beaktande av jämställdhetsperspektivet och rättighetsperspektivet. - nationellt och regionalt samarbete kring lokal administrerat skogsrestaurering ökar genom nätverk mellan deltagande organisationer samt andra aktörer inom sektorn.
- Organization
- Sida / Sweden
- Budget
- USD 275K
- Timeline
- Jun 1, 2020 → Oct 31, 2026
- Coverage
- Nepal
Complete record·1 source - active
Capacity development programme, Locally Controlled Forest Restoration (ITP+)
75%data completenessDet övergripande målet är att bidra till ökat kapacitet för lokalt administrerat skogsrestaurering i relevanta organisationer och inom ramen för Skogs- och landskapsrestaureringsprogram, som möjliggör för småbrukare och lokalsamhällen att restaurera degraderade skogslandskap och förvalta dessa hållbart. Detta förväntas på lång sikt bidra till ökade områden restaurerat och hållbart hanterat skogslandskap. På medellång sikt (outcome) förväntas programmet att bidra till förbättrade förvaltningsmekanismer där - deltagande organisationer och relevanta aktörer har en ökat förståelse och förmåga att främja affärsmöjligheter som leder till förbättrade ekosystemtjänster och försörjningsmöjligheter i samband med lokala Skogsrestaureringsinitiativ. - Multistakeholder-initiativ för lokalt administrerat Skogsrestaurering genomförs för transparent och hållbar förvaltning som möjliggör entrepreneurskap inom skogssektorn utifrån ett landskapsperspektiv och under beaktande av jämställdhetsperspektivet och rättighetsperspektivet. - nationellt och regionalt samarbete kring lokal administrerat skogsrestaurering ökar genom nätverk mellan deltagande organisationer samt andra aktörer inom sektorn.
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- Jun 1, 2020 → Oct 31, 2026
- Coverage
- Nepal
Good record·1 source - active
IFAD Financing Facility for Remittances - IFAD migration och remitteringar New Strat 2022-2026
85%data completenessProgrammets mål är att: Maximera utvecklingseffekterna av migrantarbetares remitteringar och diasporans investeringar för att uppnå de globala målen. För att nå det övergripande målet har programmet fyra målsättningar: (i) Accelerera transformationen av remitteringsmarknader genom nyttjande av innovativa affärsmodeller och ny teknologi, för att generera större marknadseffektivitet och reducerade transaktionskostnader; (ii) Främja finansiell inkludering för att förse familjer som mottar remitteringar med fler valmöjligheter till att använda pengarna produktivt; (iii) Stötta mekanismer för diasporainvesteringar som riktar sig mot landsbygdsutveckling, sysselsättning och entreprenörskap; samt (iv) Öka den globala medvetenheten kring de positiva bidrag som migrantfamiljer gör i såväl mottagande- som avsändarländer och främja ny policy och nya partnerskap när utmaningar och möjligheter uppstår.
- Organization
- Sida / Sweden
- Budget
- USD 101K
- Timeline
- Jan 1, 2020 → Dec 31, 2027
- Coverage
- Nepal
Complete record·1 source - active
Capacity development programme, Locally Controlled Forest Restoration (ITP+) - Capacity development programme, Locally controlled forest restoration
95%data completenessDet övergripande målet är att bidra till ökat kapacitet för lokalt administrerat skogsrestaurering i relevanta organisationer och inom ramen för Skogs- och landskapsrestaureringsprogram, som möjliggör för småbrukare och lokalsamhällen att restaurera degraderade skogslandskap och förvalta dessa hållbart. Detta förväntas på lång sikt bidra till ökade områden restaurerat och hållbart hanterat skogslandskap. På medellång sikt (outcome) förväntas programmet att bidra till förbättrade förvaltningsmekanismer där - deltagande organisationer och relevanta aktörer har en ökat förståelse och förmåga att främja affärsmöjligheter som leder till förbättrade ekosystemtjänster och försörjningsmöjligheter i samband med lokala Skogsrestaureringsinitiativ. - Multistakeholder-initiativ för lokalt administrerat Skogsrestaurering genomförs för transparent och hållbar förvaltning som möjliggör entrepreneurskap inom skogssektorn utifrån ett landskapsperspektiv och under beaktande av jämställdhetsperspektivet och rättighetsperspektivet. - nationellt och regionalt samarbete kring lokal administrerat skogsrestaurering ökar genom nätverk mellan deltagande organisationer samt andra aktörer inom sektorn.
- Organization
- Sida / Sweden
- Budget
- USD 293K
- Timeline
- Jun 1, 2020 → Oct 31, 2026
- Coverage
- Nepal
Complete record·1 source - active
Capacity development programme, Locally Controlled Forest Restoration (ITP+) - Utvärdering Locally controlled forest restoration (new strategy from 2024)
90%data completenessDet övergripande målet är att bidra till ökat kapacitet för lokalt administrerat skogsrestaurering i relevanta organisationer och inom ramen för Skogs- och landskapsrestaureringsprogram, som möjliggör för småbrukare och lokalsamhällen att restaurera degraderade skogslandskap och förvalta dessa hållbart. Detta förväntas på lång sikt bidra till ökade områden restaurerat och hållbart hanterat skogslandskap. På medellång sikt (outcome) förväntas programmet att bidra till förbättrade förvaltningsmekanismer där - deltagande organisationer och relevanta aktörer har en ökat förståelse och förmåga att främja affärsmöjligheter som leder till förbättrade ekosystemtjänster och försörjningsmöjligheter i samband med lokala Skogsrestaureringsinitiativ. - Multistakeholder-initiativ för lokalt administrerat Skogsrestaurering genomförs för transparent och hållbar förvaltning som möjliggör entrepreneurskap inom skogssektorn utifrån ett landskapsperspektiv och under beaktande av jämställdhetsperspektivet och rättighetsperspektivet. - nationellt och regionalt samarbete kring lokal administrerat skogsrestaurering ökar genom nätverk mellan deltagande organisationer samt andra aktörer inom sektorn.
- Organization
- Sida / Sweden
- Budget
- USD 9K
- Timeline
- Jun 1, 2020 → Oct 31, 2026
- Coverage
- Nepal
Complete record·1 source - completed
MyRight (SHIA)frame south and east 2014 - MyRight south 2014
85%data completenessSupport to the frame organisation MyRight during 2014
- Organization
- Sida / Sweden
- Budget
- USD 814K
- Timeline
- Jan 1, 2014 → Aug 31, 2015
- Coverage
- Nepal
Complete record·1 source - completed
MyRight (SHIA)frame south and east 2014 - MyRight east 2014
70%data completenessSupport to the frame organisation MyRight during 2014
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- Jan 1, 2014 → Aug 31, 2015
- Coverage
- Nepal
Good record·1 source - completed
MyRight (SHIA)frame south and east 2014
65%data completenessSupport to the frame organisation MyRight during 2014
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- Jan 1, 2014 → Aug 31, 2015
- Coverage
- Nepal
Good record·1 source - completed
PMU Frame south and east 2014 - PMU Frame east 2014
85%data completenessPMU, Pentecostal Alliance, frame support to cooperation in the south 2014; support to local organisations working right based.
- Organization
- Sida / Sweden
- Budget
- USD 2K
- Timeline
- Jan 1, 2014 → Nov 30, 2015
- Coverage
- Nepal
Complete record·1 source - completed
PMU Frame south and east 2014
65%data completenessPMU, Pentecostal Alliance, frame support to cooperation in the south 2014; support to local organisations working right based.
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- Jan 1, 2014 → Nov 30, 2015
- Coverage
- Nepal
Good record·1 source - completed
Swedish Mission Council frame 2017-2021 - SMR Swedish Mission Council frame 2017-2021
95%data completenessSMR has submitted an additional application for Sida grants for 2018-2019 in total 122,000,000 SEK. ADDITIONAL APPLICATION Prior to this agreement period, the Pentecostal Mission's development cooperation (PMU) has not been given renewed status as a framework organization at Sida and thus no longer receives direct support from the CSO grant. Instead, PMU, which is a member organization of SMR, has chosen to apply for grants for projects in support of civil society in developing countries from SMR, which pass on grants from the CSO grant. Prior to the current sub-agreement for the period 2017-2021, SMR has already received an offer from Sida to supplement it with an additional application for the period 2018-2019, which corresponds to SMR's assessment and recommendations for support to PMU. Subsequently, PMU has submitted to SMR with an application for a grant from SMR for the period 2018-2019. BUDGET SMR is applying for a total of SEK 122,000,000 for the two-year period 2018-2019, in addition to the already agreed amount of SEK 790,000,000. This is the same amount that the PMU applied for to SMR. SMR's total budget for the supplementary application 2018-2019 is SEK 134,551,400 (including SEK 12,551,400 in own contribution). The distribution between SMR, their Swedish member organizations and the local partners changes somewhat for the period to which the supplementary application relates. Based on the total budget for the supplementary application 2018-2019, the proportion staying with the Swedish member organizations increases from 13% to 19% and the proportion staying with the local partners decreases correspondingly from 81% to 75%. About 6% still stay with SMR. BASIS FOR PAGE ASSESSMENT The preparation has largely been based on SMR's input assessment of PMU's program application, but also SMR's organizational assessment of PMU and Sida's follow-up of SMR and PMU in Kenya, May 2017. Sida has also had access to PMU's program application to SMR, and the PMU's response to SMR's supplementary questions regarding the application. THE PREPARATION Since the intervention is prepared as a supplementary intervention decision, the preparation has, as far as possible, been based on the extensive preparation made of the application for the ongoing agreement period 2017-2021. As the assessment made of the application 2017-2021 is still relevant, this has been retained and supplementary comments regarding 2018-2019 have been added where the additional application causes an updated supplementary assessment. The revisions made by the committee therefore only affect the period 2018-2019.
- Organization
- Sida / Sweden
- Budget
- USD 2.6M
- Timeline
- Jan 1, 2017 → Apr 15, 2025
- Coverage
- Nepal
Complete record·1 source - completed
Swedish Mission Council frame 2017-2021 - Amendment for PMU 2017-2019
95%data completenessSMR has submitted an additional application for Sida grants for 2018-2019 in total 122,000,000 SEK. ADDITIONAL APPLICATION Prior to this agreement period, the Pentecostal Mission's development cooperation (PMU) has not been given renewed status as a framework organization at Sida and thus no longer receives direct support from the CSO grant. Instead, PMU, which is a member organization of SMR, has chosen to apply for grants for projects in support of civil society in developing countries from SMR, which pass on grants from the CSO grant. Prior to the current sub-agreement for the period 2017-2021, SMR has already received an offer from Sida to supplement it with an additional application for the period 2018-2019, which corresponds to SMR's assessment and recommendations for support to PMU. Subsequently, PMU has submitted to SMR with an application for a grant from SMR for the period 2018-2019. BUDGET SMR is applying for a total of SEK 122,000,000 for the two-year period 2018-2019, in addition to the already agreed amount of SEK 790,000,000. This is the same amount that the PMU applied for to SMR. SMR's total budget for the supplementary application 2018-2019 is SEK 134,551,400 (including SEK 12,551,400 in own contribution). The distribution between SMR, their Swedish member organizations and the local partners changes somewhat for the period to which the supplementary application relates. Based on the total budget for the supplementary application 2018-2019, the proportion staying with the Swedish member organizations increases from 13% to 19% and the proportion staying with the local partners decreases correspondingly from 81% to 75%. About 6% still stay with SMR. BASIS FOR PAGE ASSESSMENT The preparation has largely been based on SMR's input assessment of PMU's program application, but also SMR's organizational assessment of PMU and Sida's follow-up of SMR and PMU in Kenya, May 2017. Sida has also had access to PMU's program application to SMR, and the PMU's response to SMR's supplementary questions regarding the application. THE PREPARATION Since the intervention is prepared as a supplementary intervention decision, the preparation has, as far as possible, been based on the extensive preparation made of the application for the ongoing agreement period 2017-2021. As the assessment made of the application 2017-2021 is still relevant, this has been retained and supplementary comments regarding 2018-2019 have been added where the additional application causes an updated supplementary assessment. The revisions made by the committee therefore only affect the period 2018-2019.
- Organization
- Sida / Sweden
- Budget
- USD 386K
- Timeline
- Jan 1, 2017 → Apr 15, 2025
- Coverage
- Nepal
Complete record·1 source - completed
PMU Frame south and east 2014 - PMU Frame South 2014
85%data completenessPMU, Pentecostal Alliance, frame support to cooperation in the south 2014; support to local organisations working right based.
- Organization
- Sida / Sweden
- Budget
- USD 91K
- Timeline
- Jan 1, 2014 → Nov 30, 2015
- Coverage
- Nepal
Complete record·1 source - completed
LO/TCO SOUTH 2005-2006
70%data completenessThe activity does not have a description. You can contact Sida for more information. Call +46 8 698 50 00 or send an e-mail to sida@sida.se.
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- Jan 1, 2005 → Jun 28, 2008
- Coverage
- Nepal
Good record·6 sources
How to read project data
A missing budget or date means the source did not provide it to Nepal Impact; it is not an estimate. Completeness measures the presence of core fields, while data confidence reflects source-level trust. Use the original source and the correction link on each project page for verification.