Public project record · Nepal
Development projects in Nepal
Explore projects reported by development organizations, donors, and public sources. Every record shows what is known, what is not reported, and where the evidence comes from.
- completed
Implementation Costs - Public Finance Management
95%data completenessThis activity Implementation Costs - Public Finance Management is a component of Public Finance Management reported by FCDO with a funding type of 109 - Multilateral organisation and a budget of £3,500,000. It works in the following sector(s): Public finance management (PFM), Democratic participation and civil society.
- Organization
- FCDO Nepal
- Budget
- USD 5.5M
- Timeline
- Dec 24, 2010 → Jan 22, 2018
- Coverage
- Nepal
Complete record·1 source - completed
Design Consultancy- Public Finance Management
95%data completenessThis activity Design Consultancy- Public Finance Management is a component of Public Finance Management reported by FCDO with a funding type of 104 - Procurement of Services and a budget of £66,685. It works in the following sector(s): Public finance management (PFM), Anti-corruption organisations and institutions.
- Organization
- FCDO Nepal
- Budget
- USD 30K
- Timeline
- Jan 24, 2010 → Jan 22, 2018
- Coverage
- Nepal
Complete record·1 source - completed
Rural Reconstruction & Rehabilitation Sector Dev
65%data completenessTo reduce poverty through improved rural infrastructure
- Organization
- FCDO Nepal
- Budget
- — · not reported
- Timeline
- Mar 5, 2009 → Sep 15, 2014
- Coverage
- Nepal
Good record·1 source - completed
Contract with Asian Development Bank
85%data completenessThis activity Contract with Asian Development Bank is a component of Rural Reconstruction & Rehabilitation Sector Dev reported by FCDO with a funding type of 109 - Multilateral organisation and a budget of £9,012. It works in the following sector(s): Transport policy and administrative management.
- Organization
- FCDO Nepal
- Budget
- USD 15K
- Timeline
- Apr 1, 2008 → Feb 29, 2016
- Coverage
- Nepal
Complete record·1 source - completed
Project Management and Technical Assistance
95%data completenessThis activity Project Management and Technical Assistance is a component of Rural Reconstruction & Rehabilitation Sector Dev reported by FCDO with a funding type of 104 - Procurement of Services and a budget of £188,898. It works in the following sector(s): Road transport, Decentralisation and support to subnational government, Rural development, Social Protection, Construction policy and administrative management.
- Organization
- FCDO Nepal
- Budget
- USD 285K
- Timeline
- Apr 1, 2008 → Feb 29, 2016
- Coverage
- Nepal
Complete record·1 source - completed
Rural Reconstruction & Rehabilitation Sector Development Programme - Implementation
95%data completenessThis activity Rural Reconstruction & Rehabilitation Sector Development Programme - Implementation is a component of Rural Reconstruction & Rehabilitation Sector Dev reported by FCDO with a funding type of 108 - Non-budget support financial aid and a budget of £12,433,568. It works in the following sector(s): Road transport, Construction policy and administrative management, Rural development, Decentralisation and support to subnational government, Social Protection.
- Organization
- FCDO Nepal
- Budget
- USD 18.9M
- Timeline
- Apr 1, 2008 → Feb 29, 2016
- Coverage
- Nepal
Complete record·1 source - completed
South Asia Water Initiative
75%data completenessTo develop the knowledge, relationships and institutions to enable significant and measurable improvements in international water resource management.
- Organization
- FCDO Nepal
- Budget
- — · not reported
- Timeline
- Feb 17, 2009 → Mar 31, 2015
- Coverage
- Nepal
Good record·1 source - completed
India International Conference of Mountain Countries on Climate Change (FA Grant)
95%data completenessThis activity India International Conference of Mountain Countries on Climate Change (FA Grant) is a component of South Asia Water Initiative reported by FCDO with a funding type of 108 - Non-budget support financial aid and a budget of £14,447. It works in the following sector(s): Environmental policy and administrative management.
- Organization
- FCDO Nepal
- Budget
- USD 22K
- Timeline
- Jan 1, 2009 → Sep 30, 2014
- Coverage
- Nepal
Complete record·1 source - completed
Peace & Development Strategy Fund
65%data completenessNational Peace and Development and aid effectiveness strategies effectively guide government and international community programming
- Organization
- FCDO Nepal
- Budget
- — · not reported
- Timeline
- Jan 12, 2009 → Dec 31, 2012
- Coverage
- Nepal
Good record·1 source - completed
Consultancies - Peace & Development Strategy Fund
70%data completenessThis activity Consultancies - Peace & Development Strategy Fund is a component of Peace & Development Strategy Fund reported by FCDO with a funding type of 104 - Procurement of Services and a budget of £218,448. It works in the following sector(s): Public sector policy and administrative management, Civilian peace-building, conflict prevention and resolution.
- Organization
- FCDO Nepal
- Budget
- — · not reported
- Timeline
- Jan 1, 2009 → Jun 30, 2014
- Coverage
- Nepal
Good record·1 source - completed
Support to UNDP (RC Office, Developing Capacity for Aid Effectiveness Etc)
85%data completenessThis activity Support to UNDP (RC Office, Developing Capacity for Aid Effectiveness Etc) is a component of Peace & Development Strategy Fund reported by FCDO with a funding type of 109 - Multilateral organisation and a budget of £620,938. It works in the following sector(s): Public sector policy and administrative management, Civilian peace-building, conflict prevention and resolution.
- Organization
- FCDO Nepal
- Budget
- USD 872K
- Timeline
- Jan 1, 2009 → Jun 30, 2014
- Coverage
- Nepal
Complete record·1 source - completed
Empowerment and Rights of Natural Fibre Producers CSCF444
75%data completenessTo establish sustainable mechanisms through which natural fibre producers in the target districts can assert their rights to services and information and influence policy measures relevant to their livelihoods
- Organization
- FCDO Nepal
- Budget
- — · not reported
- Timeline
- Dec 4, 2008 → Mar 31, 2013
- Coverage
- Nepal
Good record·1 source - completed
Accountable Grant CSCF0444: EMPOWERMENT AND ASSERTION OF NATURAL FIBRE PRODUCERS
80%data completenessThis activity Accountable Grant CSCF0444: EMPOWERMENT AND ASSERTION OF NATURAL FIBRE PRODUCERS is a component of Empowerment and Rights of Natural Fibre Producers CSCF444 reported by FCDO with a funding type of 111 - Not for profit organisation and a budget of £47,878. It works in the following sector(s): Democratic participation and civil society, Agricultural development, Trade policy and administrative management, Agricultural policy and administrative management.
- Organization
- FCDO Nepal
- Budget
- — · not reported
- Timeline
- Jul 1, 2008 → Sep 30, 2014
- Coverage
- Nepal
Complete record·1 source - completed
Centre for inclusive growth
65%data completenessTo develop practical solutions to binding constraints on investment and economic growth
- Organization
- FCDO Nepal
- Budget
- — · not reported
- Timeline
- Dec 15, 2010 → Nov 10, 2015
- Coverage
- Nepal
Good record·1 source - completed
Centre for Inclusive Growth - Economist cost
80%data completenessThis activity Centre for Inclusive Growth - Economist cost is a component of Centre for inclusive growth reported by FCDO with a funding type of 104 - Procurement of Services and a budget of £108,496. It works in the following sector(s): Financial policy and administrative management, Energy policy and administrative management.
- Organization
- FCDO Nepal
- Budget
- — · not reported
- Timeline
- Jan 1, 2009 → May 10, 2017
- Coverage
- Nepal
Complete record·1 source - completed
Centre for Inclusive Growth - Evaluation
80%data completenessThis activity Centre for Inclusive Growth - Evaluation is a component of Centre for inclusive growth reported by FCDO with a funding type of 104 - Procurement of Services and a budget of £77,200. It works in the following sector(s): Public sector policy and administrative management, Research/scientific institutions.
- Organization
- FCDO Nepal
- Budget
- USD 89K
- Timeline
- Jan 1, 2009 → May 10, 2017
- Coverage
- Nepal
Complete record·1 source - completed
Centre for Inclusive Growth - Implementation Phase
85%data completenessThis activity Centre for Inclusive Growth - Implementation Phase is a component of Centre for inclusive growth reported by FCDO with a funding type of 103 - Procurement of goods and a budget of £15,216,708. It works in the following sector(s): Public sector policy and administrative management, Research/scientific institutions.
- Organization
- FCDO Nepal
- Budget
- USD 25.2M
- Timeline
- Jan 1, 2009 → May 10, 2017
- Coverage
- Nepal
Complete record·1 source - completed
Centre for Inclusive Growth - Design Phase
85%data completenessThis activity Centre for Inclusive Growth - Design Phase is a component of Centre for inclusive growth reported by FCDO with a funding type of 104 - Procurement of Services and a budget of £99,853. It works in the following sector(s): Business policy and administration, Communications policy and administrative management.
- Organization
- FCDO Nepal
- Budget
- USD 157K
- Timeline
- Jan 1, 2009 → May 10, 2017
- Coverage
- Nepal
Complete record·1 source - completed
Rural Reconstruction & Rehabilitation Sector Development Programme - Design cost
80%data completenessThis activity Rural Reconstruction & Rehabilitation Sector Development Programme - Design cost is a component of Rural Reconstruction & Rehabilitation Sector Dev reported by FCDO with a funding type of 104 - Procurement of Services and a budget of £451,457. It works in the following sector(s): Transport policy and administrative management, Rural development, Construction policy and administrative management, Social Protection, Decentralisation and support to subnational government.
- Organization
- FCDO Nepal
- Budget
- — · not reported
- Timeline
- Apr 1, 2008 → Feb 29, 2016
- Coverage
- Nepal
Complete record·1 source - active
UNV placement in Nepal
85%data completenessUNV placement supporting UNRCPD's work. The United
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 42K
- Timeline
- Jan 1, 2018 → Dec 31, 2018
- Coverage
- Nepal
Complete record·1 source - active
F.a: Disability Inclusive DRR in flood prone areas in the southern plain of Nepal
80%data completenessDisability inclusive disaster risk and resilience building including local disaster risk plans.
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- — · not reported
- Timeline
- Nov 2, 2005 → Dec 31, 2021
- Coverage
- Nepal
Complete record·1 source - active
F.a: LWF: Local2Global / ESCR Yearbook Nepal
80%data completenessThe project aims to build capacity of local communities, duty bearers civil society and other stakeholders in generating evidences for the issues from ground, organizing evidence-based advocacy to claim their rights, and linking local level issues to natio nal and international level. By doing so, the project will contribute to the formulatiomendment and implementation of laws, policies and programs for target right holders. As a result, target right holders will be able to enjoy more human rights.
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- — · not reported
- Timeline
- Jan 1, 2018 → Dec 31, 2018
- Coverage
- Nepal
Complete record·1 source - active
F.a: Sahas: Mountain Community development programme
95%data completenessThe project aims to improve the livelihood and food security situation of marginalized, resource poor, dalits, women and people with disabilities living in remote area of four districts. The project builds the capacity of the community through institution al/grassroots organisation and socio-political development, agriculture and livelihood improvement, and community infrastructure development. Gender inclusion, people with disability, environment, climate change and disaster risk reduction (DRR) component s are included as cross-cutting theme. The project is implemented in current working area of Gorkha, Dhading, Tanahu and Mugu in 2018 and then from 2019 the project will be implemented in new areas of the Gorkha, Tanahu and Dhading.
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 1.0M
- Timeline
- Nov 2, 2005 → Dec 31, 2021
- Coverage
- Nepal, Dhading
Complete record·3 sources - active
F.a: Village electrification with wind turbine and solar power system in Nepal's Upper Mustang region
90%data completenessIn the project a hybrid electricity system based on wind and photovoltaic will be installed in very remote Chumjung village in dry upland area of Upper Mustang in the northernmost Nepal. The one-kilowatt windmill will be constructed locally from Nepalese materials. Reliability to village electrification will be provided by 3 kW solar electricity system. Direct beneficiaries include around 130 persons in 40 households. Also village school will receive electricity. Village Electrification Committee (VEC) wi ll be responsible for all decision making during project implementation and post-construction including operation and management of the system, as well as sets the electricity tariffs for households. The desired development impact of the project is the so cio-economic upliftment of the last-mile community through the use of modern energy services, and improved promotion of solar wind hybrid technology through demonstration for communities in similar geographical locations of Nepal. The anticipated outcomes of project are: Electrification of the current households and the only primary school in Chumjung village. Enhanced capacity of local users to operate and manage installed energy system. Project partner is Nepalese NGO Energy, Environment Research and Deve lopment Centre (EERDC), which works to improve the livelihoods of rural people by providing sustainable and renewable energy technologies. In this project, EERDC partners with People Energy and Environment Development Association (PEEDA) NGO, which has ple nty of experience in implementing energy projects and in supporting local participation in them. www.eerdc.org.np and www.peeda.net
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 18K
- Timeline
- Nov 2, 2005 → Dec 31, 2021
- Coverage
- Mustang, Gandaki
Complete record·1 source - active
F.a: Improving Rural Livelihoods in Nepal with Pico-Hydro Electrification and Improved Water Mill
90%data completenessThe project consists of electrification of two rural villages (Nachne and Himma) in Nepals Udaipur district with pico hydro power and building of water mills for grain milling next to the picohydro plants. Very small hydropower (pico or micro hydro) is ve ry appropriate technology in mountainous Nepal, in this project the water flow of streams is not blocked, but only small part of water flow is diverted to electricity generation and water mills. The direct beneficiaries are 155 families and the project bri ngs remarkable social and developmental impacts into communities. Two far flung villages will receive electricity, which brings positive social benefits, promotes livelihood opportunities and reduce climate emissions by replacing the use of biomass and fos sil fuels. Increasing of mechanical energy by constructing water mills will reduce the work load (of carrying grains for milling to other villages), enhances food security and promotes processing of agricultural products. The project will improve especiall y womens status in communities. The expected outputs of the project are: Installation of two Pico hydro system having 5 kW power for each project, Electricity access to 155 households for lighting, operating radio and TV, Use of low electricity such as LE D lamps (for all households), Establishment of at least 8 home based micro-enterprises operating directly or indirectly from the use of generated electricity, Capacity development of at least 20 beneficiaries (50% at least women) for micro-enterprise and i ncome diversification activities, Effort will be made to link the project with financing from the financial institutions, Banks specially for promoting project based enterprises, Capacity building of 8 community members as operators and technicians for ope ration, maintenance of the Pico hydro system and house wiring related works involving women, Capacity building of local partner organization in the technical aspects of Pico hydro and project implementation. Project partner is Nepalese organisation Centre for Rural Technology, Nepal (CRT/N), which has a long experience with renewable energy and appropriate technology installations. CRT/N has cooperated since 1990s to develop rural conditions and livelihoods with many funding organisations and is active in s everal international renewable energy networks. www.crtnepal.org
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 24K
- Timeline
- Jan 1, 2018 → Dec 31, 2018
- Coverage
- Nepal
Complete record·1 source - active
F.a: Upscaling of skills training and technical education for employment programme
95%data completeness1. Project: 11883 Upscaling of skills training and technical education for employment programme (STEP) #2. Project area and Country: Kailali and Dadeldhura districts in Far-West of Nepal #3. Project justification: #The population of Haliyas, Kamaiyas and K amalaris (HKK) are comparatively high in the Far West of Nepal. The region has limited opportunities for unskilled youths to engage in wage and self-employment work. The project targets youths from Haliya, Kamaiya, Kamalaris and Badi communities. These com munities are considered to be the most marginalized and vulnerable groups due to high incidence of poverty, illiteracy and human rights violence. The youths from these communities are heavily migrated to Indian cities for employment opportunities or are co mpelled to engage in low paying and high risk works to generate income for their families. TVET can support these target youths from remote area to live dignified life. However, due to high demand upon TVET to youths and concentration of TVET service provi ders in urban areas, the access of quality TVET is challenge for these target groups. #4. The main objective and the expected results: #The project aims to increase awareness and access to market focused quality vocational skills training to marginalized a nd vulnerable women and youths for their gainful employment. Strengthened advocacy and partnership among TVET stakeholders will be promoted for creating income and employment opportunities for trained youths and women.#5. Right-holders/ beneficiaries: 115 youths (16 to 29 years of age), 25% will be girls and young women (no of beneficiaries in 2019- the project will end in May 2019)#Duty bearers: Centre for Technical Education and Vocational training (CTEVT), Cooperative Division, District Agriculture Offic e, Freed Kamaiya Women Development Forum (FKWDF), Integrated Development Society (IdeS).#6. Implementing partner: Underprivileged Children's Educational Programs (UCEP) Nepal
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 5K
- Timeline
- Nov 2, 2005 → Dec 31, 2021
- Coverage
- Dadeldhura, Kailali
Complete record·1 source - active
F.a: Promoting Indigenous Peoples´ Land Rights in Nepal
95%data completenessDue to state policies in Nepal the IPs are losing ownership and control of lands that resulted displacement and threat to continue their existence and identity. Non recognition of customary lands , land acquisition, lack of free, prior and informed consent (FPIC), compensation to the affected, displacement, land dispossessions, full disclosure on projects, ignorance of religious, sacred site and pasture lands are some of the crucial issues pertaining to the land rights of IPs in Nepal. Often indigenous peop les and local communities have been confronting with the aforementioned issues in relation to lands caused by the development projects implemented by the government and private sectors. There are hundreds of hydropower development projects operated in the lands of IPs. The project is intended to enhance capacity of the IPs and local communities to defend their rights. Furthermore, this project also contributes in policy reformation with the engagement of the state and non-state actors, particularly private sectors. In the course of implementation of the project indigenous and local communities are supported in raising their human rights issues at the local level to international levels. For that LAHURNIP will organise capacity development activities and supp ort them to file cases to the courts, complaints to the international mechanisms such as the ILO, UN Special Rapporteurs, grievance mechanisms of the World Bank (Inspection Panel, the Compliance Advisor Ombudsman-CAO) and Asian Development Banks to make th e State and private sectors accountable for protecting and respecting human rights of the indigenous and local communities. The project will also contribute to enhance partnership and coordination with the national and international human rights institute s working in the areas of human rights to support in defending the rights of indigenous and local communities. Apart from that the propose project also contribute to initiate facilitated dialogue with the projects and state to resolve dispute in amicable m anners. www.lahurnip.org
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 53K
- Timeline
- Jan 1, 2018 → Dec 31, 2018
- Coverage
- Nepal
Complete record·1 source - completed
Food and Nutrition Crisis Response - LSFF+
95%data completenessto leverage social protection programs to increase sustainability and nutrition sensitivity of the food and nutrition security crisis response
- Organization
- Gates Foundation
- Budget
- USD 1.6M
- Timeline
- Jun 5, 2023 → Jun 23, 2026
- Coverage
- Nepal
Complete record·1 source - active
VL elimination support to Bangladesh and Nepal
95%data completenessto support last mile implementation activities to achieve validation of elimination of Visceral Leishmaniasis (VL) as a public health problem in Bangladesh and Nepal.
- Organization
- Gates Foundation
- Budget
- USD 1.6M
- Timeline
- Nov 30, 2022 → Dec 31, 2027
- Coverage
- Nepal
Complete record·1 source - completed
Towards the Design of Effective WASH Regulatory Arrangements for S. Asia
95%data completenessto establish regulatory mechanisms for sanitation that ensure equitable and inclusive sanitation services
- Organization
- Gates Foundation
- Budget
- USD 264K
- Timeline
- Aug 10, 2022 → Sep 16, 2025
- Coverage
- Nepal
Complete record·1 source
How to read project data
A missing budget or date means the source did not provide it to Nepal Impact; it is not an estimate. Completeness measures the presence of core fields, while data confidence reflects source-level trust. Use the original source and the correction link on each project page for verification.