Public project record · Nepal
Development projects in Nepal
Explore projects reported by development organizations, donors, and public sources. Every record shows what is known, what is not reported, and where the evidence comes from.
- completed
Priority River Basins Flood Risk Management Project
95%data completenessThe priority river basins flood risk management project will improve the resilience of communities to flooding in six river basins in the Terai region in Nepal. It is in line with Nepal's National Water Plan, 2002-2027 to reduce social and economic losses from water-induced disasters through blending structural and nonstructural measures. The project will protect agricultural land and households in priority areas from a 1-in-50-year return period flood by constructing flood embankments, spurs, and outlet structures. The local response to flooding will be strengthened through the development installation of flood forecasting and early warning systems (FFEWSs) and community-based disaster risk management (CBDRM).
- Organization
- Asian Development Bank
- Budget
- USD 750K
- Timeline
- Oct 23, 2020 → Jun 30, 2026
- Coverage
- Nepal
Complete record·3 sources·Funded by Asian Development Bank - active
Mechanized Irrigation Innovation Project
95%data completenessThe project will provide long-term sustainable solutions to increase year-round access to irrigation water in about 22,400 hectares (ha) of command area in Rautahat and Sarlahi districts of Madhesh Province in the Terai. This will provide increased climate resilience and water security to poor rural farmers by constructing a large-scale network of about 500 deep tube wells (DTWs) with dedicated and reliable electricity distribution networks. The management, operation, and maintenance (MOM) of the tube well irrigation schemes will be contracted to a third-party operator, using a design-build-operate (DBO) contracting modality. On-demand irrigation services will be provided to at least 121,000 farmers using innovative technology with a prepaid water metering system. The project will be the first of its kind in Nepal and will transition from traditional irrigation systems toward a more resilient and sustainable irrigation system.
- Organization
- Asian Development Bank
- Budget
- USD 110.0M
- Timeline
- Dec 11, 2024 → Oct 9, 2030
- Coverage
- Rautahat, Sarlahi
Complete record·2 sources·Funded by Asian Development Bank - active
Kathmandu Valley Water Supply Improvement Project (Phase 2)
100%data completenessThe project aims to ensure drinking water security in the Kathmandu Valley and to provide access to safe, sustainable, resilient, and inclusive water supply services to 2 million people by (i) constructing climate- and disaster-resilient urban water supply infrastructure; (ii) strengthening systems to improve the efficiency, sustainability, and resilience of water supply services; and (iii) enhancing the capacity of urban water supply institutions and stakeholders. The project is a continuation of the ongoing partnership between the Asian Development Bank (ADB) and the Government of Nepal to support the water and other urban infrastructure services sector in the country.
- Organization
- Asian Development Bank
- Budget
- USD 170.0M
- Timeline
- Dec 20, 2024 → Jun 30, 2031
- Coverage
- Kathmandu, Bagmati
Complete record·2 sources·Funded by Asian Development Bank - completed
Water Resources Project Preparatory Facility
100%data completenessThe project impact will be accelerated expansion of areas covered by irrigation, drainage and flood control infrastructure. The outcome will be improved readiness of water resources management projects for implementation. The Project's expected outputs are: (i) detailed feasibility studies for high priority water resources projects undertaken; (ii) environmental, social, and technical capacity of the Department of Water Resources and Irrigation (DWRI) improved; (iii) Irrigation Master Plan updated; and (iv) efficient project management. Given the ADB country strategy and government priorities, the Project will (i) prepare a project for the rehabilitation and expansion of farmer managed irrigation systems, and the rehabilitation and partial management transfer of some agency-managed irrigation systems; (ii) undertake water-induced hazard mapping and prepare a water-induced disaster prevention project for a priority river basin; and, (iii) prepare other high priority projects as identified by DWRI. The Project will prepare these projects to a level of detailed feasibility which includes technical study, safeguard screening and plans preparation, and economic and financial analysis of at least 30% of subprojects for project readiness, thereby advancing activities which would normally occupy the first one or two years of implementation. The Project will enhance the capacities of staff of the DWRI through formal and on-the-job training (including participation in project preparation under the Project). Importantly, the Project will reorganize and strengthen the existing Environment Section of DWRI as a Social and Environment Section with (i) clear terms of reference of the section, (ii) environmental and social safeguards guidelines developed to ensure safeguard planning and implementation process complies with the national laws, regulations and ADB's Safeguard Policy Statement requirements; and (iii) gender equality and social inclusion (GESI) guidelines on project planning and implementation prepared. The Project will help update the Irrigation Master Plan with a view to the sustainable development and management of irrigation systems in the country until 2030. Changes in land use, water use, agricultural technology, irrigation and water resources policy and legislation, and the extent of irrigation development since the Master Plan was prepared will be reviewed.
- Organization
- Asian Development Bank
- Budget
- USD 11.0M
- Timeline
- Nov 2, 2012 → Jul 19, 2021
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - completed
Building Climate Resilience of Watersheds in Mountain Eco-Regions
95%data completenessThe Project will support the implementation of the Strategic Program for Climate Resilience (SPCR) which has recently been developed by the Government of Nepal in partnership with Asian Development Bank (ADB), International Finance Corporation (IFC) and the World Bank and was endorsed by the Pilot Program for Climate Resilience sub-committee of the Climate Investment Funds (CIF) on 28 June 2011. Within the overall framework of the SPCR, the Project will enable communities in mountainous ecosystems that are significantly vulnerable to climate change impacts to have improved access to and reliability of watershed and water resources. The Project aims to provide access to more reliable water resources for domestic purposes and irrigation for communities living in the watersheds of Nepal's river systems, which are significantly vulnerable to climate change. The watersheds selected lie in six districts in the Far-Western Development Region: Achham, Baitadi, Bajhang, Bajura, Dadeldhura, and Doti. Access to and reliability of water resources will be improved through a participatory program of integrated watershed management with interventions in upland areas to increase surface water storage and groundwater recharge.
- Organization
- Asian Development Bank
- Budget
- USD 23.5M
- Timeline
- Jan 20, 2014 → Feb 8, 2021
- Coverage
- Achham, Baitadi
Complete record·1 source·Funded by Asian Development Bank - active
Kathmandu Valley Wastewater Management Project
100%data completenessThe project is investing in rehabilitation and expansion of sewerage network, modernization and expansion of wastewater treatment plants (WWTPs), and improvement of wastewater management in the Kathmandu Valley that will help improve service delivery and reduce pollution of the Bagmati River and its tributaries. The project is also strengthening the institutions working for wastewater management in the Kathmandu Valley to increase operational efficiency and improve service delivery, and will result in positive impacts on health and quality of life for the residents of Kathmandu Valley. The project is coordinating with other related projects to fulfill the medium-term priority investment needs identified in the long-term capital investment and asset management program.
- Organization
- Asian Development Bank
- Budget
- USD 80.0M
- Timeline
- Jul 3, 2013 → Jun 30, 2019
- Coverage
- Kathmandu, Bagmati
Complete record·1 source·Funded by Asian Development Bank - active
Tanahu Hydropower Project
100%data completenessThe project has three main components: (i) a medium-sized hydropower plant of 140 megawatts (MW) with significant water storage facilities and associated transmission lines to evacuate the generated power; (ii) rural electrification and community development in the project area, and (iii) a reform and restructuring plan for the national utility, the Nepal Electricity Authority (NEA). The project site is in the Seti River in the Tanahu district, about 150 kilometers (km) west of Kathmandu.
- Organization
- Asian Development Bank
- Budget
- USD 30.0M
- Timeline
- Apr 22, 2013 → Jun 30, 2021
- Coverage
- Kathmandu, tanahu
Complete record·4 sources·Funded by Asian Development Bank - completed
Integrated Urban Development Project
100%data completenessThe project will provide the population in the municipalities of Dharan, Janakpur, Nepalgunj, and Siddharthanagar with better access to municipal infrastructure and services in a socially inclusive manner. In accordance with the priorities of each municipality, integrated urban environmental improvements, including drainage systems, solid waste management (SWM) facilities, and urban roads, will be implemented in Janakpur, Nepalgunj, and Siddharthanagar municipalities. A water supply development subproject will be implemented in Dharan municipality. The project will also undertake community development programs (CDPs), focusing primarily on poverty pockets in the municipalities and communities that may not benefit directly from major infrastructure improvement subprojects. Gender equality and social inclusion (GESI) will be mainstreamed in all subprojects in the municipalities, and the capacity to address GESI in the Ministry of Physical Planning and Works (MPPW) will be strengthened by establishing an appropriate institutional structure and mechanisms for GESI mainstreaming.
- Organization
- Asian Development Bank
- Budget
- USD 44.8M
- Timeline
- May 8, 2012 → Sep 21, 2020
- Coverage
- Nepal
Complete record·4 sources·Funded by Asian Development Bank - completed
Second Small Towns Water Supply and Sanitation Sector Project
100%data completenessThe Project has three components. Component 1 will develop an efficient, effective, and accountable urban water supply and sanitation sector by establishing and implementing policies, establishing service standards, and enhancing sector coordination. Component 2 will entail development of safe, accessible, and adequate water supply and sanitation facilities in about 20 small towns. Component 3 will strengthen governance and capacity for project management and operation.
- Organization
- Asian Development Bank
- Budget
- USD 45.1M
- Timeline
- Nov 27, 2009 → Mar 18, 2019
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - completed
Rural Reconstruction and Rehabilitation Sector Development Program (Program grant)
100%data completenessThe goal of the Program is to improve the living conditions and well being of number of people in the conflict affected areas by restoring basic social infrastructure, community and public services, and livelihoods. The Program will provide basic needs in the conflict-affected aread through income-generation activities through rural roads, water supply and sanitation, community development, and institutional infrastructure.
- Organization
- Asian Development Bank
- Budget
- USD 50.0M
- Timeline
- Jan 14, 2008 → Jan 26, 2012
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - completed
Rural Reconstruction and Rehabilitation Sector Development Program (Project grant)
100%data completenessThe goal of the Program is to improve the living conditions and well-being of number of people int he conflict affected areas by restoring basic social infrstructure, community and public services, and livelihoods. The Program will provide basic needs in the conflict-affected areas through income-generation activities through rural roads, water supply and sanitation, community development and institutional infrastructure.
- Organization
- Asian Development Bank
- Budget
- USD 50.0M
- Timeline
- Jan 14, 2008 → Jun 23, 2014
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - completed
Community Irrigation Project
100%data completenessThe project will develop or improve small-scale irrigation systems in 12 districts in Nepal through a community-driven process targeted at the poor, women, and other disadvantaged groups. Small irrigation systems are defined as systems with less than 25 hectares of irrigation area in the hills and mountains and less than 200 hectares in the Terai plains. The participating districts were selected because of their high poverty, food insecurity and irrigation potential. They are Kanchanpur, Kailali, Dang, Kapilvastu in the Terai plains; Doti, Salyan, Rukum, Rolpa, Pyuthan in the hills; and Bajhang, Jumla, Mugu in the mountains. As the first large-scale intervention in small irrigation development in Nepal, the project will demonstrate participatory irrigation planning and management and build the capacity of all levels of the government for small-scale irrigation development. Farmers will form or strengthen existing water users associations (WUAs) to apply for project support. The project will provide support to rehabilitate and build new surface water irrigation schemes and to develop groundwater irrigation through shallow tube wells. It will also facilitate access to microfinance support and provide extension services. For farmers without access to electricity who are installing shallow tube wells, the project will connect them to the electricity network. WUAs will in turn learn to manage water more efficiently and equitably, maintain their systems, and apply improved agricultural practices.
- Organization
- Asian Development Bank
- Budget
- USD 24.4M
- Timeline
- Feb 8, 2011 → Mar 13, 2019
- Coverage
- kapilbastu, Pyuthan
Complete record·1 source·Funded by Asian Development Bank - active
Urban Water Supply and Sanitation (Sector) Project
100%data completenessADB has supported the government in improving water supply and sanitation services in 70 of the 176 small towns in Nepal through three small towns projects introducing continuous water supply, meeting national quality standards, and providing universal household connections with subsidized connections and affordable supply for poor and vulnerable households.
- Organization
- Asian Development Bank
- Budget
- USD 130.0M
- Timeline
- Nov 26, 2018 → Apr 30, 2024
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - completed
Third Small Towns Water Supply and Sanitation Sector Project
100%data completenessADB and the Government of Nepal are working together to provide water supply and sanitation services to selected small towns in the country. The Third Small Town Water Supply and Sanitation Sector Project is providing the services to small towns with a population of 5,000 to 40,000 that show the potential for growth by having access to roads, power supply and telecommunications. This includes the upgrade or construction of water supply systems in up to 20 small towns, involving 1,450 kilometers of water supply pipelines; 67,500 household connections; and 20 water treatment systems with an estimated capacity of 50,000 cubic meters per day. The project will also provide about 5,000 household toilets with septic tanks, as well as provision of septic management facilities and equipment. Drainage systems and master plans are also prepared in towns with flooding risks. Training is being provided to help local water agencies modernize their operations and manage water rates, and to teach local communities public awareness on water conservation and public hygiene.
- Organization
- Asian Development Bank
- Budget
- USD 60.0M
- Timeline
- Nov 25, 2014 → Dec 15, 2021
- Coverage
- Nepal
Complete record·1 source·Funded by Asian Development Bank - active
Kathmandu Valley Water Supply Improvement Project
100%data completenessADB and the Government of Nepal are working together to help the residents of the Kathmandu Valley to obtain greater access to clean water on a long-term basis. The Kathmandu Valley Water Supply Improvement Project is working to improve the efficiency and the reliability of the water supply system in the area while at the same time upgrading the infrastructure at the water source areas through a related project that is constructing the Melamchi tunnel and expanding the water treatment plant This project is expanding reservoirs, capacity and providing water connections with a focus on serving the poor and households headed by women. The long-term goal of the project is to provide affordable, clean water to the people of Kathmandu Valley for years to come.
- Organization
- Asian Development Bank
- Budget
- USD 80.0M
- Timeline
- Nov 10, 2011 → Jun 30, 2017
- Coverage
- Kathmandu, Bagmati
Complete record·1 source·Funded by Asian Development Bank - active
Rural Village Water Resources Management Project (III phase)
80%data completenessThe Rural Village Water Resources Management Project in Nepal Phase II (2010-2015) has after four years of implementation achieved better water supply for 93 000 people sanitation for 269 000 people and home gardens for 155 000 people. The purpose of phase III is to achieve full coverage of water supply and sanitation and establishment of functional planning and implementation frameworks for all water uses in nine project districts. The expected results of the project are: 1) institutionalized community cap acity to construct and maintain community managed water supply and adopt appropriate technologies and behavior 2) Improved and sustainable nutrition food security and sustainable income at community level through water resources based livelihoods developme nt 3) Institutionalized capacity at district level to continue integrated water resources planning and support to communities in implementing and maintaining WASH and livelihood activities. In terms of beneficiaries the project will reach over 300 000 peop le. The executing agency is Ministry of Federal Affairs and Local Development of Nepal together with participating District Development Committees (DDC). Finland will support the project with 15 million euros from 2015 to 2020.
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- — · not reported
- Timeline
- Dec 5, 2014 → Dec 31, 2022
- Coverage
- Nepal
Complete record·6 sources - active
SUSTAINABLE WATER SUPPLY AND CAPACITY BUILDING IN DEVCHULI MUNICIPALITY
80%data completenessFinnish water projects have supported the government of Nepal in developing decentralized community based water and sanitation approach and working modalities since 1990. Project in Devchuli Nepal is an extension to WaterFinns NAPA WASH project in Nepal in 2014-2016. There is great potential in developing the area to the next level in water quality and sanitation by capacity building in municipality and ward level trainings and minor construction to ensure the long term sustainability based on self-reliance of the communities. There is a need to increase understanding and awareness of sustainability of WASH services and facilities in user committees ward and municipality level. There is a clear demand for a continuation project after NAPA WASH; Devchuli area has basic level water and sanitation services however the quality of water and skill of maintaining WSP are not still sufficient and therefore causes health issues. The overall project objective is to improve the self-reliance of Devchuli communities to sustain their WASH services at acceptable good level to ensure safe drinking water and healthy hygienic environment for the whole community. This is done by applying tested Operation + Maintenance and Management practices new technologies and capacity buil ding at the community ward and municipality level. The project is situated in Devchuli municipality in Nawalparasi Nepal. Devchuli has a population of 34912 with 6336 individual households which all are direct or indirect beneficiaries of the project. Proj ect management is done by WaterFinns Finland with the local partner Center for Appropriate Technology Nepal (CATN) in Nepal in addition to the Devchuli municipality. Project?s beneficiaries are the users of WASH services in Devichuli Municipality.The proje ct is designed also to support the Sustainable Development Goals (SDG) especially of 5. Gender equality 6. Clean water and sanitation 10. Reduced inequalities and 13. Climate action. The project will integrate Climate Change Adaptation and Disaster Risk Re duction measures in the WASH process e.g. the WSP aiming to minimize the impacts of weather induced disasters.
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- — · not reported
- Timeline
- Dec 3, 2013 → Dec 31, 2020
- Coverage
- Nepal
Complete record·4 sources - active
Rural Water Supply and Sanitation Project in Western Nepal Completion Phase
80%data completenessFinland has in 2012 agreed to support Rural Water Supply and Sanitation Project in Western Nepal (RWSSP-WN II) with 137 million euros. The overall objective of the project is improved health and fulfilment of the equal right to water and sanitation service s for the inhabitants of the Project area. In the last three years the Project has built 172 water supply schemes which serve approximately 85 000 people. From the 14 districts in the Project area only 3 are still without access to sanitation services. Fin land will support the Project with an additional 1 million euro funding. The additional funding will increase the number of beneficiaries of the Project and guarantee the sustainability of the water supply schemes. With the additional funding (1 million eu ros from Finland and 1 million euros from Nepal) the overall budget of the Project for the years 2013-2019 will be 2423 million euros of which Finland´s share will be 147 million euros. The additional funding of 05MEUR applied for in 2018 will be directed to the project investment funds. The funds will be utilized to complete the already started water schemes conducting Water Safety Plan-trainings and enhancing the capacity of the newly established municipalities' M-WASH-Units.
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- — · not reported
- Timeline
- Dec 20, 2012 → Dec 31, 2020
- Coverage
- Nepal
Complete record·4 sources - active
Towards Arsenic Safe Groundwater in Nepal
95%data completenessThe presence of arsenic in groundwater is a common problem affecting the quality of drinking water on the plateaus of Nepal. Using water containing arsenic as drinking water in cooking or irrigation may cause a plethora of health issues even cancer. In Nep al the work to reduce the levels of arsenic is fragmentary and lacking in cooperation and coordination between local officials. In addition knowledge about the health hazards of arsenic among the consumers of contaminated water is scarce.The Geological Sur vey of Finland (GTK) and the Finnish Environment Institute?s (SYKE) shared project will strengthen coordination the sharing of information and cooperation between agents in different fields who have for now worked in silos. The Department of Water Supply a nd Sewerage Management (DWSSM) whose responsibility is water quality will implement the Project as a partner organization.The immediate goal of the Project is to improve the partner organization?s capacity to guide and support stakeholders in the field of water management to prevent and reduce the prevalence and use of water contaminated by arsenic.The goal for the first output area is to strengthen the knowledge-based instruction of the DWSSM on diminishing of the presence of arsenic. This is attainable by enhancing the flow of information between different stakeholders developing effective processes for the handling of information as well as increasing the understanding of how geological conditions affect the quality of the water in Nepal. The second outpu t area focuses on the DWSSM?s ability to use and adapt geological and hydrogeological research regarding the arsenic problem in ground water as a base for decision making. The third output area is to improve their tracking of arsenic levels and the practic es of analysis of the data. Tighter cooperation and interaction between the DWSSM and stakeholders is also one of the output areas of the project. During the project a public communications plan on the arsenic issue will be developed for the department.
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 1.1M
- Timeline
- Apr 2, 2020 → Dec 31, 2023
- Coverage
- Nepal
Complete record·2 sources - active
F.a: Nepal Country Programme
80%data completenessNepals biodiversity is under constant threat from habitat degradation and fragmentation, deforestation and forest degradation, poaching and illegal wildlife trade and unsustainable infrastructure development. Vulnerability to natural disasters and climate change is remarkable. Threatened species such as tigers and snow leopards are threatened by poaching and illegal wildlife trade. Rural people are dependent on the natural resources for their daily needs to provide food, fodder, energy and water. Moreover, climate change has exacerbated the threats to biodiversity and peoples livelihoods. Theres also now window of opportunity to facilitate conservation mainstreaming in new federal structure.##Geographically programme focuses to the far-western parts of Nepal which belong under the Terai Arc Landscape. Programme aims to improve the forest corridor cover and connectivity as well as support buffer zone conservation and management through community-based conservation and cooperation with district forest officers. Improvement of the livelihoods and wellbeing of the local communities is gained through developing income generating activities such as forest-based enterprises and by increasing access to low carbon energy. In addition, we increase conservation awareness and empower local youth to act for the environment. We also support local communities to adapt in climate change by developing ecosystem based adaptation solutions. Programme tackles illegal wildlife trade and poaching by supporting community-based anti-p oaching groups. ##Expected achievements by 2021# Around 3,000 ha of degraded forest is under improved management and restoration# Community forest groups and their members are capacitated and empowered to manage forests# Sustainable forest management plans are prepared and implemented for degraded forest area# At least 3 green community based enterprises are established and strengthened# 5,000 plus youth and children are made aware of conservation issues and challenges##Beneficiaries: the local community fo rest user groups, women and youth groups, ethnic minority groups, forest workers and disadvantaged groups, local governments.##Implementor: WWF Nepal (www.wwfnepal.org)
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- — · not reported
- Timeline
- Jan 1, 2018 → Dec 31, 2020
- Coverage
- Nepal, Sudurpashchim
Complete record·5 sources - active
Institutional Cooperation between Finland and Nepal in meteorological services; 3rd Phase
80%data completenessThe Finnish Meteorological Institute has carried out institutional cooperation (ICI) with the Nepalese counterpart Department of Hydrology and Meteorology (DHM) in the years 2010-2012 and 2013-2017. DHM is an organization under the Ministry of Population a nd Environment in Nepal. DHM has a mandate from Government to monitor all the hydrological and meteorological activities in Nepal.The first phase of the project was evaluated in 2012. The conclusion was that DHM had a high ownership of the project and mutu al accountability had been evident in the project. It was noted that the project had addressed the specific needs of the DHM and the impact of the project had been positive. However improvements were suggested to wider dissemination of skills within the De partment results-based management and targeting of participants to the trainings. The recommendations were taken into account in the planning of the second phase of the project.The third phase of the project will continue to respond to the development need s of the Government of Nepal and the DHM in the years 2018-2021. The funding for the third phase is 500 000 euros. The overall objective of the project is improved capability of the Government of Nepal to respond to the increased risks of natural disasters related to weather and climate. The project has three main expected results: 1) Improved processes of DHM to manage the new observation systems 2) Improved production and service system 3) Enhanced Customer Relations
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- — · not reported
- Timeline
- Jun 27, 2018 → Dec 31, 2021
- Coverage
- Nepal
Complete record·5 sources - active
Early Recovery and Expertise Reconstruction post-earthquake
75%data completenessImmediately after the 25th of April 2015 earthquake in Nepal, the Humanitarian Aid of SDC deployed a rapid response team to the affected area consisting of experts in the field of shelter, medicine and water and sanitation. This intervention is followed by an early recovery and reconstruction program which focuses during eleven months on knowledge transfer on seismic sound reconstruction and the provision of access to remote and mountainous areas affected by the earthquake.
- Organization
- Swiss Development Cooperation
- Budget
- — · not reported
- Timeline
- Oct 1, 2015 → Mar 31, 2018
- Coverage
- Nepal
Good record·7 sources - completed
South Asia Water Initiative
75%data completenessTo develop the knowledge, relationships and institutions to enable significant and measurable improvements in international water resource management.
- Organization
- FCDO Nepal
- Budget
- — · not reported
- Timeline
- Feb 17, 2009 → Mar 31, 2015
- Coverage
- Nepal
Good record·1 source - completed
India International Conference of Mountain Countries on Climate Change (FA Grant)
95%data completenessThis activity India International Conference of Mountain Countries on Climate Change (FA Grant) is a component of South Asia Water Initiative reported by FCDO with a funding type of 108 - Non-budget support financial aid and a budget of £14,447. It works in the following sector(s): Environmental policy and administrative management.
- Organization
- FCDO Nepal
- Budget
- USD 22K
- Timeline
- Jan 1, 2009 → Sep 30, 2014
- Coverage
- Nepal
Complete record·1 source - active
F.a: Improving Rural Livelihoods in Nepal with Pico-Hydro Electrification and Improved Water Mill
90%data completenessThe project consists of electrification of two rural villages (Nachne and Himma) in Nepals Udaipur district with pico hydro power and building of water mills for grain milling next to the picohydro plants. Very small hydropower (pico or micro hydro) is ve ry appropriate technology in mountainous Nepal, in this project the water flow of streams is not blocked, but only small part of water flow is diverted to electricity generation and water mills. The direct beneficiaries are 155 families and the project bri ngs remarkable social and developmental impacts into communities. Two far flung villages will receive electricity, which brings positive social benefits, promotes livelihood opportunities and reduce climate emissions by replacing the use of biomass and fos sil fuels. Increasing of mechanical energy by constructing water mills will reduce the work load (of carrying grains for milling to other villages), enhances food security and promotes processing of agricultural products. The project will improve especiall y womens status in communities. The expected outputs of the project are: Installation of two Pico hydro system having 5 kW power for each project, Electricity access to 155 households for lighting, operating radio and TV, Use of low electricity such as LE D lamps (for all households), Establishment of at least 8 home based micro-enterprises operating directly or indirectly from the use of generated electricity, Capacity development of at least 20 beneficiaries (50% at least women) for micro-enterprise and i ncome diversification activities, Effort will be made to link the project with financing from the financial institutions, Banks specially for promoting project based enterprises, Capacity building of 8 community members as operators and technicians for ope ration, maintenance of the Pico hydro system and house wiring related works involving women, Capacity building of local partner organization in the technical aspects of Pico hydro and project implementation. Project partner is Nepalese organisation Centre for Rural Technology, Nepal (CRT/N), which has a long experience with renewable energy and appropriate technology installations. CRT/N has cooperated since 1990s to develop rural conditions and livelihoods with many funding organisations and is active in s everal international renewable energy networks. www.crtnepal.org
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- USD 24K
- Timeline
- Jan 1, 2018 → Dec 31, 2018
- Coverage
- Nepal
Complete record·1 source - completed
Towards the Design of Effective WASH Regulatory Arrangements for S. Asia
95%data completenessto establish regulatory mechanisms for sanitation that ensure equitable and inclusive sanitation services
- Organization
- Gates Foundation
- Budget
- USD 264K
- Timeline
- Aug 10, 2022 → Sep 16, 2025
- Coverage
- Nepal
Complete record·1 source - completed
National and Bilateral WSH Advocacy
95%data completenessto support policy-focused sanitation campaigns in West Africa and South Asia, and maintain prioritization of sanitation within the US Government, in efforts to advance progress towards SDG 6
- Organization
- Gates Foundation
- Budget
- USD 52K
- Timeline
- Nov 8, 2021 → Apr 16, 2025
- Coverage
- Nepal
Complete record·1 source - active
F.a: Inclusion and independence of persons with congenital deafblindness in Nepal
80%data completenessCongenitally deafblind people will be tought activites of daily living (personal hygiene, dressing, eating etc.), and basic living skills (interacting with other people). The group will produce video clips of deafblind people´s situation to raise awarenes s about deafblindness. A workshop for concerned government authorities and and other DPOs will be organized. Nepal is due to submit a report on the implementation of UNCRPD, and the group will contribute to a shadow report by giving information about the s ituation of deafblind people.
- Organization
- Ministry for Foreign Affairs of Finland
- Budget
- — · not reported
- Timeline
- Jan 1, 2016 → Dec 31, 2016
- Coverage
- Nepal
Complete record·5 sources - active
USAID Karnali Water Activity
90%data completeness(Nepal): USAID Karnali Water Activity
- Organization
- USAID Nepal
- Budget
- USD 21.5M
- Timeline
- Jul 15, 2021 → Jul 14, 2026
- Coverage
- Karnali, Nepal
Complete record·1 source·Funded by USAID Nepal - active
Integrated Watershed Management Activity
100%data completenessIntegrated Watershed Management Activity, USAID/Nepal for the Social, Environmental and Economic Development (SEED) Integration Activity, a two-year Associate Award with the objective of improving water security through better coordination and integration of USAID/Nepal's Feed the Future, Environment and Resilience activities. SWP will support USAID/Nepal and SEED implementing partners working in the Rangun Khola and Lower Karnali watersheds to develop and implement integrated plans to improve water security and strategically use results and learning to inform programming around more effective water resources management..
- Organization
- USAID Nepal
- Budget
- USD 241K
- Timeline
- Feb 15, 2018 → Feb 14, 2020
- Coverage
- Karnali, Nepal
Complete record·1 source·Funded by USAID Nepal
How to read project data
A missing budget or date means the source did not provide it to Nepal Impact; it is not an estimate. Completeness measures the presence of core fields, while data confidence reflects source-level trust. Use the original source and the correction link on each project page for verification.