Mugu Humla Link Road Project

The Mugu Humla Link Road is to be implemented through RAP3. The road will connect Humla, the last unconnected district in Nepal, to neighbouring Mugu which is already connected to a strategic road. The objectives of the RAP3 - Mugu Humla Link Road (MHLR) project are to carry out the detailed engineering design and construct approximately 67 km of engineered fair-weather earth road in accordance with Nepal Rural Road Standards, including all associated stabilization and drainage works

USD 0 budget ·USD 32.8M disbursed ·Imc Worldwide Ltd implementer ·Nepal location ·Oct 25, 2018 – May 30, 2023 timeline

Overview

About this project

The Mugu Humla Link Road is to be implemented through RAP3. The road will connect Humla, the last unconnected district in Nepal, to neighbouring Mugu which is already connected to a strategic road. The objectives of the RAP3 - Mugu Humla Link Road (MHLR) project are to carry out the detailed engineering design and construct approximately 67 km of engineered fair-weather earth road in accordance with Nepal Rural Road Standards, including all associated stabilization and drainage works

Progress

0%
  • Plan
  • Implementation
  • Outcomes

Alignment

SDG focus

No SDGs tagged.