Reported end date passed· Education

Building Back Better and Safe Schools Project - Primary

The project aims at re-building a primary school in Makwanpur District. Currently, it is running classes for ECED to Grade 7 but also has a plan to start grade 8 from upcoming academic year. A total of 170 (91 girls and 79 boys) are studying in the school. Currently, the school has four rooms in good condition and it is assessed that two rooms that were partly damaged by the earthquake will be useable after repair works. Therefore, this project will construct 8 classrooms as well as support construction of boundary wall, furnish ECED rooms, provide learning materials, provide computer support, construct two toilets with water facilities, and also undertake capacity building measures for school families.

Source-reported status: active. Timeline labels use reported dates and do not verify current activity.

Save
Not reported budget·Not reported disbursed·Plan International UK reporting organization·makawanpur, Bagmati location·May 1, 2017 → Mar 31, 2019 timeline

Reported by Plan International UK

Overview

About this project

The project aims at re-building a primary school in Makwanpur District. Currently, it is running classes for ECED to Grade 7 but also has a plan to start grade 8 from upcoming academic year. A total of 170 (91 girls and 79 boys) are studying in the school. Currently, the school has four rooms in good condition and it is assessed that two rooms that were partly damaged by the earthquake will be useable after repair works. Therefore, this project will construct 8 classrooms as well as support construction of boundary wall, furnish ECED rooms, provide learning materials, provide computer support, construct two toilets with water facilities, and also undertake capacity building measures for school families.

Field coverage

80% complete

1 source feed · 1 evidence version

Completeness measures the presence of project fields. It is not a verification score. Multiple evidence versions can come from the same feed, and feeds can reproduce the same publisher's data.

Not reported by the available sources: budget, disbursement. This is intentionally shown as unavailable rather than estimated.

Report an update or correction

Provenance

Original project evidence

1 distinct source feed across 1 recorded evidence version. These are not independent confirmations. Links below show the latest available version for each source page, up to 50 pages.

  • iati ↗

    https://d-portal.org/ctrack.html?aid=GB-COH-1364201-NPL100396

    Retrieved Oct 31, 2026 · Last checked Oct 31, 2026

Alignment

SDG focus

No SDGs tagged.