completed· WASH
Urban Survey, Model Building constructions and Strengthen capacity of KUKL
In line with PIP P00709,urban survey will prepare a baseline status on Disaster Risk Reduction (DRR) and Governance related to DRR of the selected 27 Municipalities. Model building construction will be implemented in three selected municipalities (Chandrapur, Lumbani Sanskritik and Kawasoti) where Oxfam will replicate the model for Institutionalization of National Building Code Implementation from Dhangadi of Kailali District.Where as strengthening capacity of Kathmandu Upatayaka Khanipani Limited (KUKL) will support to strengthen the existing water supply facilities during earthquake emergency.
Overview
About this project
In line with PIP P00709,urban survey will prepare a baseline status on Disaster Risk Reduction (DRR) and Governance related to DRR of the selected 27 Municipalities. Model building construction will be implemented in three selected municipalities (Chandrapur, Lumbani Sanskritik and Kawasoti) where Oxfam will replicate the model for Institutionalization of National Building Code Implementation from Dhangadi of Kailali District.Where as strengthening capacity of Kathmandu Upatayaka Khanipani Limited (KUKL) will support to strengthen the existing water supply facilities during earthquake emergency.
Record quality
85% complete
Not reported by the available sources: budget. This is intentionally shown as unavailable rather than estimated.
Report an update or correctionProgress
—- Plan
- Implementation
- Outcomes
Alignment