Public project record · Nepal
Development projects in Nepal
Explore projects reported by development organizations, donors, and public sources. Every record shows what is known, what is not reported, and where the evidence comes from.
- active
Assessing the impact of the global crisis on the agriculture and food security situation in Nepal
85%data completenessAssessing the impact of the global crisis on the agriculture and food security situation in Nepal
- Organization
- UN Pooled Funds
- Budget
- — · not reported
- Timeline
- Feb 6, 2017 → Dec 31, 2030
- Coverage
- Nepal
Complete record·1 source·Funded by UN Pooled Funds - active
Not specified 2021 - Action Against Hunger: HUM RRM 2021, 2023-2025
95%data completenessAction Against Hunger (AAH) is a global humanitarian organisation that takes action against the causes and effects of hunger and malnutrition. AAH is composed of AAH entities from France (Sida agreement partner), India, United Kingdom, Spain, USA and Canada. Each of these members are separate legal entities, but share a common charter of principles, strategy and areas of intervention. All members of the network are committed to bringing coherence and enhancing efficiency to better serve those in need of nourishment , and to adhere to the AAH principles for which it stands. These principles are: moral and financial independence, strict political and religious neutrality, non-discrimination, free and direct access to victims, professionalism and transparency. The principles are outlined in an agreement (the International Global Protocols), which is signed by all AAH members. Through this contribution, Sida will be supporting AAH with funding which will allow for AAH to provide humanitarian assistance to affected population in more than 20 countries worldwide, through flexible, programme-based funding. While the specific objective of each intervention might differ, AAH's main mandate is within the nutrition sector, with the mission to "save, improve and protect lives by eliminating hunger through the prevention, detection and treatment of undernutrition, especially during and after emergency crises caused by situations of conflict, displacement, poverty, discrimination, inequality, or natural disaster". Nutrition interventions are complemented by activities which seek to ensure that people have access to clean water, food, healthcare and protection. By being present before and after disaster strikes, AAH is committed not only to respond to emergency needs, but also to build and to strengthen the capacity and resilience of the local communities. In line with the Sida humanitarian strategy, the objective of the response is to save lives, alleviate suffering and uphold human dignity for the benefit of people in need who have been, or are at risk of becoming, affected by armed conflicts, natural disasters or other disaster emergencies. AAH's long-term planning and performance monitoring process is laid out in a five-year International Strategic Plan (ISP), which is prepared by the AAH international network. The current International Strategic Plan (ISP3) covers the period 2021-2025 and reflects AAH's priorities. To meet the overarching impact of collective and inclusive action that empowers 25 million people to overcome hunger in 2025, the key priorities to be addressed by AAH are to: 1) Save lives: Lives are saved and immediate needs are met in an effective and inclusive manner in emergency contexts; 2) Collectively build resilience: People and communities are better able to withstand future shocks. Mitigation of the climate crisis and of gender inequality is embedded in the fight against hunger; 3) Connect and mobilize: Citizens, communities, civil society and actors at all levels are mobilized as part of a collective movement to end hunger; 4) Create and share knowledge: Best practice in the fight against hunger is developed collaboratively by a diversity of actors and shared for the empowerment of all. In 2024, Sida supports AAH's humanitarian interventions in 25 specific contexts including 11 multi-year humanitarian programmes and 8 annual humanitarian programmes. Sidas contribution also supports AAH's capacity to implement life-saving responses through the Rapid Response Mechanism (RRM) in 12 contexts (as of September 2024) as well as capacity building for protection integration and humanitarian access.
- Organization
- Sida / Sweden
- Budget
- USD 311K
- Timeline
- Jan 1, 2021 → Dec 31, 2026
- Coverage
- Nepal
Complete record·2 sources - completed
SMC Frame Agr 2004-05 Sou
85%data completenessThe activity does not have a description. You can contact Sida for more information. Call +46 8 698 50 00 or send an e-mail to sida@sida.se.
- Organization
- Sida / Sweden
- Budget
- USD 2K
- Timeline
- Jan 1, 2004 → Jun 28, 2006
- Coverage
- Nepal
Complete record·22 sources - active
Disability inclusive development in Nepal
85%data completenessDisability inclusive development in Nepal
- Organization
- UN Pooled Funds
- Budget
- — · not reported
- Timeline
- Aug 6, 2011 → May 31, 2026
- Coverage
- Nepal
Complete record·4 sources·Funded by UN Pooled Funds - active
UNDP/UNCDF Climate Change Finance 2023-2027
75%data completenessOverall goal: Impact: Bangladesh, Cambodia, Nepal, Solomon Islands and Tuvalu are building inclusive climate resilient communities and local economies and are transitioning towards low carbon development pathways. Medium term outcome: Climate governance is strengthened in a gender responsive manner and additional climate finance is leveraged at the national, sectoral and sub-national levels in Bangladesh, Cambodia, Nepal, Solomon Islands and Tuvalu. Outcome 1: Public sector at national, sectoral and local levels has enhanced capacities for effective planning of climate finance. Outcome 2:Climate Change is mainstreamed into national/ local governments' planning and budgeting systems and lead to allocations/investments. Outcome 3: Country frameworks and systems established and/or strengthened for increased access to climate finance (public, private, domestic, international). Outcome 4: Enhanced inclusiveness, transparency and accountability of climate finance. Outcome 5: Strengthened regional cooperation to enable climate finance reforms in the region.
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- Jul 7, 2023 → Dec 31, 2027
- Coverage
- Nepal
Good record·2 sources - active
UNDP/UNCDF Climate Change Finance 2023-2027 - UNCDF Climate Change Finance 2023-2027
95%data completenessOverall goal: Impact: Bangladesh, Cambodia, Nepal, Solomon Islands and Tuvalu are building inclusive climate resilient communities and local economies and are transitioning towards low carbon development pathways. Medium term outcome: Climate governance is strengthened in a gender responsive manner and additional climate finance is leveraged at the national, sectoral and sub-national levels in Bangladesh, Cambodia, Nepal, Solomon Islands and Tuvalu. Outcome 1: Public sector at national, sectoral and local levels has enhanced capacities for effective planning of climate finance. Outcome 2:Climate Change is mainstreamed into national/ local governments' planning and budgeting systems and lead to allocations/investments. Outcome 3: Country frameworks and systems established and/or strengthened for increased access to climate finance (public, private, domestic, international). Outcome 4: Enhanced inclusiveness, transparency and accountability of climate finance. Outcome 5: Strengthened regional cooperation to enable climate finance reforms in the region.
- Organization
- Sida / Sweden
- Budget
- USD 2.9M
- Timeline
- Jul 14, 2023 → Dec 31, 2027
- Coverage
- Nepal
Complete record·3 sources - active
UNDP/UNCDF Climate Change Finance 2023-2027 - UNDP Climate Change Finance 2023-2027
95%data completenessOverall goal: Impact: Bangladesh, Cambodia, Nepal, Solomon Islands and Tuvalu are building inclusive climate resilient communities and local economies and are transitioning towards low carbon development pathways. Medium term outcome: Climate governance is strengthened in a gender responsive manner and additional climate finance is leveraged at the national, sectoral and sub-national levels in Bangladesh, Cambodia, Nepal, Solomon Islands and Tuvalu. Outcome 1: Public sector at national, sectoral and local levels has enhanced capacities for effective planning of climate finance. Outcome 2:Climate Change is mainstreamed into national/ local governments' planning and budgeting systems and lead to allocations/investments. Outcome 3: Country frameworks and systems established and/or strengthened for increased access to climate finance (public, private, domestic, international). Outcome 4: Enhanced inclusiveness, transparency and accountability of climate finance. Outcome 5: Strengthened regional cooperation to enable climate finance reforms in the region.
- Organization
- Sida / Sweden
- Budget
- USD 1.1M
- Timeline
- Jul 7, 2023 → Dec 31, 2027
- Coverage
- Nepal
Complete record·3 sources - active
Reorienting public finance for SDGs acceleration and leveraging additional resources in Nepal
75%data completenessReorienting public finance for SDGs acceleration and leveraging additional resources in Nepal
- Organization
- UN Pooled Funds
- Budget
- — · not reported
- Timeline
- Feb 6, 2017 → Dec 31, 2030
- Coverage
- Nepal
Good record·4 sources·Funded by UN Pooled Funds - active
Amplify Asia - Media Development Investment Fund
75%data completenessMDIF is a not-for-profit investment fund for independent media in countries where access to free and independent media is under threat. Through a fund structure, MDIF invests in media partners from startup to growth-stage, providing affordable debt and equity financing to independent news and information businesses in a range of countries where access to free and independent media is under threat. MDIF also supports its portfolio media partners with specialist technical advice and assistance. The primary purpose of the Amplify Asia programme is to strengthen the capacity of independent media in South and Southeast Asia by building their potential long-term sustainability to help them hold power to account and encourage the development of a well-informed and engaged civil society. The core components of the proposed programme are: coaching, specialist technical assistance, digital safety and security training and advice, gender mainstreaming and sub-grants. They will all be ongoing components throughout the five-year programme. The core of the programme is the provision of long-term business coaching to MDIF's media partners. While the coach works with the media partners on the development of an overall business strategy and various aspects of business development, some aspects of this require specialist help. The programme will provide this special technical assistance through the provision of the additional short-term specialist to address a particular need. The type of assistance can vary, from assistance to help with monetization of social media channels through to training on search engine optimization (SEO). Lastly, the sub-grants provision in the programme will allow MDIF to provide a modest funding pool that can be used to try out new business ideas of its media partners. These grants will be carefully integrated into the overall business capacity building work. Timeframes for the provision of digital safety and security assessments and training, as well as gender mainstreaming initiatives, will likewise be tailored to the specific needs of the media concerned. MDIF will hold an annual networking event for all media partners and their coaches and will also facilitate the participation by partners in regional conferences and peer-to-peer visits based on the needs and areas of focus of each media.
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- Jun 26, 2023 → Dec 31, 2026
- Coverage
- Nepal
Good record·4 sources - active
UNPRPD - NEPAL- Aawaaz (Voice) Inclusion for and by persons with disabilities
80%data completenessUNPRPD - NEPAL- Aawaaz (Voice) Inclusion for and by persons with disabilities
- Organization
- UN Pooled Funds
- Budget
- — · not reported
- Timeline
- Aug 6, 2011 → May 31, 2026
- Coverage
- Nepal
Complete record·4 sources·Funded by UN Pooled Funds - completed
United Nations Association in Canada - International Internships 2013-2014
95%data completenessThis project is part of CIDA's International Youth Internship Program (IYIP), funded by the Government of Canada's Youth Employment Strategy (YES). The IYIP contributes to the YES by providing a large spectrum of Canadian graduates with valuable international development work experience abroad.
- Organization
- Global Affairs Canada
- Budget
- USD 65K
- Timeline
- Mar 5, 2013 → Mar 31, 2014
- Coverage
- Nepal
Complete record·2 sources - completed
Red Cross Denmark (DRK) Strategic Partnership Agreement humanitarian funding 2018-2021
90%data completenessRed Cross Denmark Lot HUM strategic partnership 2018
- Organization
- Ministry of Foreign Affairs, Denmark
- Budget
- USD 331K
- Timeline
- Apr 26, 2018 → Sep 6, 2023
- Coverage
- Nepal
Complete record·2 sources·Funded by Ministry of Foreign Affairs, Denmark - completed
Roadside Spring Protection to Improve Water Security
100%data completenessMetaMeta Research, FutureWater and the International Centre for Integrated Mountain Development will collaborate in order to address the declining and irregular flow of water springs in Nepal’s mountainous Dhankuta municipality. The project aims to protect and enhance natural springs while ensuring reliable water supplies and maintaining road infrastructure quality by reimagining roads as tools for landscape improvement. The Department of Local Infrastructure will oversee the projects implementation.
- Organization
- Netherlands Enterprise Agency
- Budget
- USD 243K
- Timeline
- Jul 1, 2023 → Feb 25, 2026
- Coverage
- Dhankuta, Koshi
Complete record·2 sources·Funded by Netherlands Enterprise Agency - completed
Powerful water pump to irrigate higher-altitude lands
100%data completenessTogether with Himalaya Agro-ecology Research and Development and Agro-Eco Advisors, aQysta B.V. is starting a study on the use of an energy-efficient and powerful water pump to irrigate higher-altitude lands and improve soil quality of Nepalese farmland. Combined with increasing the organic materials on the farmlands, it is expected that participating farmers will use 25% less water and increase their income by 200% within two years.
- Organization
- Netherlands Enterprise Agency
- Budget
- USD 243K
- Timeline
- Dec 1, 2022 → Jul 2, 2025
- Coverage
- Nepal
Complete record·2 sources·Funded by Netherlands Enterprise Agency - completed
Swedish Mission Council frame 2017-2021
75%data completenessSMR has submitted an additional application for Sida grants for 2018-2019 in total 122,000,000 SEK. ADDITIONAL APPLICATION Prior to this agreement period, the Pentecostal Mission's development cooperation (PMU) has not been given renewed status as a framework organization at Sida and thus no longer receives direct support from the CSO grant. Instead, PMU, which is a member organization of SMR, has chosen to apply for grants for projects in support of civil society in developing countries from SMR, which pass on grants from the CSO grant. Prior to the current sub-agreement for the period 2017-2021, SMR has already received an offer from Sida to supplement it with an additional application for the period 2018-2019, which corresponds to SMR's assessment and recommendations for support to PMU. Subsequently, PMU has submitted to SMR with an application for a grant from SMR for the period 2018-2019. BUDGET SMR is applying for a total of SEK 122,000,000 for the two-year period 2018-2019, in addition to the already agreed amount of SEK 790,000,000. This is the same amount that the PMU applied for to SMR. SMR's total budget for the supplementary application 2018-2019 is SEK 134,551,400 (including SEK 12,551,400 in own contribution). The distribution between SMR, their Swedish member organizations and the local partners changes somewhat for the period to which the supplementary application relates. Based on the total budget for the supplementary application 2018-2019, the proportion staying with the Swedish member organizations increases from 13% to 19% and the proportion staying with the local partners decreases correspondingly from 81% to 75%. About 6% still stay with SMR. BASIS FOR PAGE ASSESSMENT The preparation has largely been based on SMR's input assessment of PMU's program application, but also SMR's organizational assessment of PMU and Sida's follow-up of SMR and PMU in Kenya, May 2017. Sida has also had access to PMU's program application to SMR, and the PMU's response to SMR's supplementary questions regarding the application. THE PREPARATION Since the intervention is prepared as a supplementary intervention decision, the preparation has, as far as possible, been based on the extensive preparation made of the application for the ongoing agreement period 2017-2021. As the assessment made of the application 2017-2021 is still relevant, this has been retained and supplementary comments regarding 2018-2019 have been added where the additional application causes an updated supplementary assessment. The revisions made by the committee therefore only affect the period 2018-2019.
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- Jan 1, 2017 → Apr 15, 2025
- Coverage
- Nepal
Good record·1 source - completed
Swedish Mission Council frame 2017-2021 - Amendment for PMU 2020-2021
95%data completenessSMR has submitted an additional application for Sida grants for 2018-2019 in total 122,000,000 SEK. ADDITIONAL APPLICATION Prior to this agreement period, the Pentecostal Mission's development cooperation (PMU) has not been given renewed status as a framework organization at Sida and thus no longer receives direct support from the CSO grant. Instead, PMU, which is a member organization of SMR, has chosen to apply for grants for projects in support of civil society in developing countries from SMR, which pass on grants from the CSO grant. Prior to the current sub-agreement for the period 2017-2021, SMR has already received an offer from Sida to supplement it with an additional application for the period 2018-2019, which corresponds to SMR's assessment and recommendations for support to PMU. Subsequently, PMU has submitted to SMR with an application for a grant from SMR for the period 2018-2019. BUDGET SMR is applying for a total of SEK 122,000,000 for the two-year period 2018-2019, in addition to the already agreed amount of SEK 790,000,000. This is the same amount that the PMU applied for to SMR. SMR's total budget for the supplementary application 2018-2019 is SEK 134,551,400 (including SEK 12,551,400 in own contribution). The distribution between SMR, their Swedish member organizations and the local partners changes somewhat for the period to which the supplementary application relates. Based on the total budget for the supplementary application 2018-2019, the proportion staying with the Swedish member organizations increases from 13% to 19% and the proportion staying with the local partners decreases correspondingly from 81% to 75%. About 6% still stay with SMR. BASIS FOR PAGE ASSESSMENT The preparation has largely been based on SMR's input assessment of PMU's program application, but also SMR's organizational assessment of PMU and Sida's follow-up of SMR and PMU in Kenya, May 2017. Sida has also had access to PMU's program application to SMR, and the PMU's response to SMR's supplementary questions regarding the application. THE PREPARATION Since the intervention is prepared as a supplementary intervention decision, the preparation has, as far as possible, been based on the extensive preparation made of the application for the ongoing agreement period 2017-2021. As the assessment made of the application 2017-2021 is still relevant, this has been retained and supplementary comments regarding 2018-2019 have been added where the additional application causes an updated supplementary assessment. The revisions made by the committee therefore only affect the period 2018-2019.
- Organization
- Sida / Sweden
- Budget
- USD 376K
- Timeline
- Jan 1, 2017 → Apr 15, 2025
- Coverage
- Nepal
Complete record·1 source - completed
Swedish Mission Council frame 2017-2021 - Amendment for PMU 2017-2019
95%data completenessSMR has submitted an additional application for Sida grants for 2018-2019 in total 122,000,000 SEK. ADDITIONAL APPLICATION Prior to this agreement period, the Pentecostal Mission's development cooperation (PMU) has not been given renewed status as a framework organization at Sida and thus no longer receives direct support from the CSO grant. Instead, PMU, which is a member organization of SMR, has chosen to apply for grants for projects in support of civil society in developing countries from SMR, which pass on grants from the CSO grant. Prior to the current sub-agreement for the period 2017-2021, SMR has already received an offer from Sida to supplement it with an additional application for the period 2018-2019, which corresponds to SMR's assessment and recommendations for support to PMU. Subsequently, PMU has submitted to SMR with an application for a grant from SMR for the period 2018-2019. BUDGET SMR is applying for a total of SEK 122,000,000 for the two-year period 2018-2019, in addition to the already agreed amount of SEK 790,000,000. This is the same amount that the PMU applied for to SMR. SMR's total budget for the supplementary application 2018-2019 is SEK 134,551,400 (including SEK 12,551,400 in own contribution). The distribution between SMR, their Swedish member organizations and the local partners changes somewhat for the period to which the supplementary application relates. Based on the total budget for the supplementary application 2018-2019, the proportion staying with the Swedish member organizations increases from 13% to 19% and the proportion staying with the local partners decreases correspondingly from 81% to 75%. About 6% still stay with SMR. BASIS FOR PAGE ASSESSMENT The preparation has largely been based on SMR's input assessment of PMU's program application, but also SMR's organizational assessment of PMU and Sida's follow-up of SMR and PMU in Kenya, May 2017. Sida has also had access to PMU's program application to SMR, and the PMU's response to SMR's supplementary questions regarding the application. THE PREPARATION Since the intervention is prepared as a supplementary intervention decision, the preparation has, as far as possible, been based on the extensive preparation made of the application for the ongoing agreement period 2017-2021. As the assessment made of the application 2017-2021 is still relevant, this has been retained and supplementary comments regarding 2018-2019 have been added where the additional application causes an updated supplementary assessment. The revisions made by the committee therefore only affect the period 2018-2019.
- Organization
- Sida / Sweden
- Budget
- USD 386K
- Timeline
- Jan 1, 2017 → Apr 15, 2025
- Coverage
- Nepal
Complete record·1 source - completed
UNV Midwifes 2020
65%data completenessSverige har åtagit sig att bidra till genomförandet av Agenda 2030 i låg- och medelinkomstländer genom att tillhandahålla personal som arbetar med och genom FN-organens och Världsbankens olika mandat. Insatsen bidrar till genomförandet av Agenda 2030, med stark koppling till SDG-mål nr 3 "god hälsa och välbefinnande", genom att tillhandahålla personal inom prioriterade ämnesområden. Insatsen bidrar till WHO:s pågående kampanj som syftar till att uppmärksamma sjuksköterskor och barnmorskors arbete världen över. Insatsen omfattar fem barnmorsketjänster som finansieras av Sida under initialt ett års tid. Tjänsterna kanaliseras genom United Nations Volunteers (UNV) Programme (Fully Funded) med utplacering på UNFPA och WHO. Inom ramen för insasten ingår också annonsering av tjänsterna i Barnmorskeförbundets tidskrift Jordemodern. Insatsen är förenlig med strategin för kapacitetsutveckling och Agenda 2030 (KAPAME), i synnerhet beträffande målområdet svensk resursbasutveckling. I enlighet med målområdet för svensk resursbasutveckling förväntas den här insatsen att bidra till delmålen: - Ökad svensk representation på strategiska tjänster i internationellt utvecklingssamarbete, samt; - Ökad användning och återföring av svensk kompetens och erfarenheter inom internationellt utvecklingssamarbete.
- Organization
- Sida / Sweden
- Budget
- — · not reported
- Timeline
- May 22, 2020 → Jun 30, 2024
- Coverage
- Nepal
Good record·6 sources - completed
The government and social partners have promoted fundamental principles and rights at work to protect workers especially from unacceptable forms of work
85%data completenessThe government and social partners have promoted fundamental principles and rights at work to protect workers especially from unacceptable forms of work
- Organization
- ILO Nepal
- Budget
- — · not reported
- Timeline
- Jan 1, 2020 → Dec 31, 2021
- Coverage
- Nepal
Complete record·4 sources·Funded by ILO Nepal - completed
Strengthened institutional capacity of employers' organizations
85%data completenessStrengthened institutional capacity of employers' organizations
- Organization
- ILO Nepal
- Budget
- — · not reported
- Timeline
- Jan 1, 2020 → Dec 31, 2021
- Coverage
- Nepal
Complete record·6 sources·Funded by ILO Nepal - completed
Constituents and stakeholders at national, provincial, and local levels have promoted more and better jobs, especially for young women, men and disadvantaged groups
85%data completenessConstituents and stakeholders at national, provincial, and local levels have promoted more and better jobs, especially for young women, men and disadvantaged groups
- Organization
- ILO Nepal
- Budget
- — · not reported
- Timeline
- Jan 1, 2020 → Dec 31, 2021
- Coverage
- Nepal
Complete record·2 sources·Funded by ILO Nepal - completed
Government and stakeholders have strengthened capacity to improve entrepreneurial potential and skills in the informal economy while facilitating the transition to formality
85%data completenessGovernment and stakeholders have strengthened capacity to improve entrepreneurial potential and skills in the informal economy while facilitating the transition to formality
- Organization
- ILO Nepal
- Budget
- — · not reported
- Timeline
- Jan 1, 2020 → Dec 31, 2021
- Coverage
- Nepal
Complete record·2 sources·Funded by ILO Nepal - completed
The social partners have effectively implemented good governance frameworks and rule of law on labour migration.
85%data completenessThe social partners have effectively implemented good governance frameworks and rule of law on labour migration.
- Organization
- ILO Nepal
- Budget
- — · not reported
- Timeline
- Jan 1, 2020 → Dec 31, 2021
- Coverage
- Nepal
Complete record·4 sources·Funded by ILO Nepal - completed
Tripartite constituents have enforced the Labour Act (2017) and Labour Regulations (2018)
75%data completenessTripartite constituents have enforced the Labour Act (2017) and Labour Regulations (2018)
- Organization
- ILO Nepal
- Budget
- — · not reported
- Timeline
- Jan 1, 2020 → Dec 31, 2021
- Coverage
- Nepal
Good record·4 sources·Funded by ILO Nepal - completed
Social protection institutions have implemented the Contribution-based Social Security Act (2017) and Regulations (2018)
85%data completenessSocial protection institutions have implemented the Contribution-based Social Security Act (2017) and Regulations (2018)
- Organization
- ILO Nepal
- Budget
- — · not reported
- Timeline
- Jan 1, 2020 → Dec 31, 2021
- Coverage
- Nepal
Complete record·4 sources·Funded by ILO Nepal - completed
Hydrogeologist for Kathmandu Ecological Urban Renewal Project
100%data completenessThe Partners for Water Program, executed by the Netherlands Enterprise Agency (RVO) and commissioned by the Ministry of Infrastructure and Water Management, supports the Asian Development Bank (ADB) and its member countries with expertise and technical support on Nature-based Solutions (NbS) during the preparation phase of ADB’s projects. This assignment is part of this partnership.Currently, the ADB is setting up a Project Preparation Study (PPS) named the Kathmandu Ecological Urban Renewal Project Preparation Study, set to kick-off in March 2024 and initially lasting for eight months. The PPS will promote urban environmental improvement, urban poverty reduction, climate change mitigation or adaptation, and improved environmental governance within urban areas. An ADB-Cities Development Initiative for Asia (CDIA) Project Team of consultants will be working on the PPS from late April 2024 in two stages. In this assignment, a hydrogeologist will look at feasibility and identification of NBS measures to support the formulation of next steps in the project.
- Organization
- Netherlands Enterprise Agency
- Budget
- USD 44K
- Timeline
- Oct 10, 2024 → Dec 5, 2024
- Coverage
- Kathmandu, Bagmati
Complete record·2 sources·Funded by Netherlands Enterprise Agency - completed
Strategic NBS advice to Kathmandu Ecological Renewal Project
100%data completenessThe Partners for Water Program, executed by the Netherlands Enterprise Agency (RVO) and commissioned by the Ministry of Infrastructure and Water Management, supports the Asian Development Bank (ADB) and its member countries with expertise and technical support on Nature-based Solutions (NBS) during the preparation phase of ADB’s projects. This assignment is part of this partnership.Currently, the ADB is setting up a Project Preparation Study (PPS) named the Kathmandu Ecological Urban Renewal Project Preparation Study, set to kick-off in March 2024 and initially lasting for eight months. The PPS will promote urban environmental improvement, urban poverty reduction, climate change mitigation or adaptation, and improved environmental governance within urban areas. An ADB-CDIA (Cities Development Initiative for Asia) Project Team of consultants will be working on the PPS from late April 2024 in two stages. In this assignment, a hydrogeologist will look at feasibility and identification of NBS measures to support the formulation of next steps in the project.
- Organization
- Netherlands Enterprise Agency
- Budget
- USD 44K
- Timeline
- Sep 16, 2024 → Dec 9, 2024
- Coverage
- Kathmandu, Bagmati
Complete record·2 sources·Funded by Netherlands Enterprise Agency - completed
Red Cross Denmark (DRK) Strategic Partnership Agreement 2018-2021
90%data completenessRed Cross Denmark strategic partnership 2018
- Organization
- Ministry of Foreign Affairs, Denmark
- Budget
- USD 4.1M
- Timeline
- Apr 26, 2018 → Jun 19, 2025
- Coverage
- Nepal
Complete record·2 sources·Funded by Ministry of Foreign Affairs, Denmark - completed
Canadian International Immunization Initiative - Phase 3
95%data completenessThis program is a component within the Canadian International Immunization Initiative, aiming to support national childhood immunization systems in collaboration with the World Health Organization (WHO) and UNICEF. The objective is to improve the health of people - especially children of less than five years of age - by investing in disease prevention and childhood immunization programs, and by promoting equitable access to essential primary health care services. The Canadian Public Health Association identifies and draws upon medical experts to assist WHO, UNICEF and the Ministries of Health in partner countries to continue the global fight against vaccine-preventable diseases in developing countries.
- Organization
- Global Affairs Canada
- Budget
- USD 96K
- Timeline
- Nov 18, 2010 → Apr 30, 2013
- Coverage
- Nepal
Complete record·2 sources - completed
Sustainable Livelihoods Through Co-operatives
95%data completenessThe program aims to promote the cooperative model to support economic growth and improve food security in communities. The expected results are: (1) viable co-operatives provide timely, relevant and gender-sensitive programs and services to members; (2) government decision-makers are influenced by co-operative sector; (3) increased social and economic empowerment of women and men; and (4) effective participation of Canadians in promoting gender equitable sustainable economic and social growth in participating countries. These results are expected to contribute to strengthening specific areas of expertise, including human resource development, governance training, business planning, marketing training, and technical assistance.
- Organization
- Global Affairs Canada
- Budget
- USD 416K
- Timeline
- Apr 4, 2011 → Sep 30, 2015
- Coverage
- Nepal
Complete record·2 sources
How to read project data
A missing budget or date means the source did not provide it to Nepal Impact; it is not an estimate. Completeness measures the presence of core fields, while data confidence reflects source-level trust. Use the original source and the correction link on each project page for verification.