Reported end date passed· Education

Nepal Community Reconstruction Project (NCRP): Task Order to reconstruct secondary schools in Kathmandu valley

This Task Order includes all activities to complete construction of three secondary Kathmandu Valley schools and furnish essential items for the operation of the facilities. The schools include: i) Kanya Mandir Secondary School, Nhyokha, Kathmandu; ii) Shree Bhagawati Secondary School, Sankharapur, Kathmandu; and iii) Adarsha Secondary School, Sanothimi, Bhaktapur. The Contractor must provide all labor, supervision, material, equipment, and other resources as required to reconstruct and renovate secondary school facilities, in accordance with drawings, specifications and instructions provided under the Invitation for Bids (IFB). This Task Order includes a base bid item and an additive bid item. The base bid item is for new construction and all associated work for the construction of Kanya Mandir Secondary School and Shree Bhagawati Secondary School. The additive bid Item is for architectural, and seismic retrofitting and new construction of Adarsha Secondary School..

Source-reported status: completed. Timeline labels use reported dates and do not verify current activity.

Save
USD 6.6M budget·USD 6.6M disbursed·USAID Nepal reporting organization·Bhaktapur, Kathmandu location·Jan 17, 2018 → Jan 16, 2025 timeline

Reported by USAID Nepal

Overview

About this project

This Task Order includes all activities to complete construction of three secondary Kathmandu Valley schools and furnish essential items for the operation of the facilities. The schools include: i) Kanya Mandir Secondary School, Nhyokha, Kathmandu; ii) Shree Bhagawati Secondary School, Sankharapur, Kathmandu; and iii) Adarsha Secondary School, Sanothimi, Bhaktapur. The Contractor must provide all labor, supervision, material, equipment, and other resources as required to reconstruct and renovate secondary school facilities, in accordance with drawings, specifications and instructions provided under the Invitation for Bids (IFB). This Task Order includes a base bid item and an additive bid item. The base bid item is for new construction and all associated work for the construction of Kanya Mandir Secondary School and Shree Bhagawati Secondary School. The additive bid Item is for architectural, and seismic retrofitting and new construction of Adarsha Secondary School..

Field coverage

100% complete

1 source feed · 2 evidence versions

Completeness measures the presence of project fields. It is not a verification score. Multiple evidence versions can come from the same feed, and feeds can reproduce the same publisher's data.

Core project fields are present in the source-backed record.

Report an update or correction

Reported disbursement / budget

100.0%

USD 6.6M reported disbursed against USD 6.6M reported budget. This financial ratio does not measure implementation or outcomes.

Provenance

Original project evidence

1 distinct source feed across 2 recorded evidence versions. These are not independent confirmations. Links below show the latest available version for each source page, up to 50 pages.

  • iati ↗

    https://d-portal.org/ctrack.html?aid=US-GOV-1-72036718F00001

    Retrieved Oct 26, 2026 · Last checked Oct 26, 2026

Alignment

SDG focus

No SDGs tagged.