Skip to content

Within reported dates· Disaster Risk· Climate

Synthesis of Earthquake and Landslide Risk to Inform Emergency Preparedness and Planning in Nepal

This is a study towards synthesising lessons about the nature, distribution, and evolution of risks from earthquake- and monsoon-triggered hazards (landslides and floods) in Nepal – based on current literature and stakeholder consultations. This study would aim to shape recommendations for FCDO’s support to the Government of Nepal, especially the implementation of the Resilience, Adaptation and Inclusion in Nepal and the Local Infrastructure Services Programme programmes, alongside advice to the Humanitarian Country Team of British Embassy Kathmandu to inform national-scale contingency planning.

Source-reported status: active. Timeline labels use reported dates and do not verify current activity.

Save
USD 66K budget·USD 32K disbursed·FCDO Nepal reporting organization·Kathmandu, Bagmati location·Mar 13, 2026 → Mar 1, 2027 timeline

Reported by FCDO Nepal

Overview

About this project

This is a study towards synthesising lessons about the nature, distribution, and evolution of risks from earthquake- and monsoon-triggered hazards (landslides and floods) in Nepal – based on current literature and stakeholder consultations. This study would aim to shape recommendations for FCDO’s support to the Government of Nepal, especially the implementation of the Resilience, Adaptation and Inclusion in Nepal and the Local Infrastructure Services Programme programmes, alongside advice to the Humanitarian Country Team of British Embassy Kathmandu to inform national-scale contingency planning.

Field coverage

95% complete

1 source feed · 2 evidence versions

Completeness measures the presence of project fields. It is not a verification score. Multiple evidence versions can come from the same feed, and feeds can reproduce the same publisher's data.

Not reported by the available sources: partner organizations. This is intentionally shown as unavailable rather than estimated.

Report an update or correction

Reported disbursement / budget

48.0%

USD 32K reported disbursed against USD 66K reported budget. This financial ratio does not measure implementation or outcomes.

Provenance

Original project evidence

1 distinct source feed across 2 recorded evidence versions. These are not independent confirmations. Links below show the latest available version for each source page, up to 50 pages.

  • iati ↗

    https://d-portal.org/ctrack.html?aid=GB-GOV-1-400844-442

    Retrieved Oct 26, 2026 · Last checked Oct 26, 2026

Alignment

SDG focus

No SDGs tagged.