Reported end date passed· WASH
Resilient WASH related infrastructures
This includes all the construction cost required for the construction of water supply schemes and water treatment facilities and the technical human resources required to deliver those construction work together with the cost required for water recharge ponds and various water use and optimisation measures including sanitation and hygiene facilities.
Source-reported status: active. Timeline labels use reported dates and do not verify current activity.
Reported by FCDO Nepal
Overview
About this project
This includes all the construction cost required for the construction of water supply schemes and water treatment facilities and the technical human resources required to deliver those construction work together with the cost required for water recharge ponds and various water use and optimisation measures including sanitation and hygiene facilities.
Field coverage
95% complete
Completeness measures the presence of project fields. It is not a verification score. Multiple evidence versions can come from the same feed, and feeds can reproduce the same publisher's data.
Not reported by the available sources: partner organizations. This is intentionally shown as unavailable rather than estimated.
Report an update or correctionReported disbursement / budget
71.6%USD 4.1M reported disbursed against USD 5.7M reported budget. This financial ratio does not measure implementation or outcomes.
Provenance
Original project evidence
1 distinct source feed across 1 recorded evidence version. These are not independent confirmations. Links below show the latest available version for each source page, up to 50 pages.
- iati ↗
https://d-portal.org/ctrack.html?aid=GB-GOV-1-301013-102
Retrieved Sep 5, 2026 · Last checked Sep 5, 2026
Alignment