Resilient WASH related infrastructures

This includes all the construction cost required for the construction of water supply schemes and water treatment facilities and the technical human resources required to deliver those construction work together with the cost required for water recharge ponds and various water use and optimisation measures including sanitation and hygiene facilities.

Save
USD 5.7M budget·USD 4.1M disbursed·FCDO Nepal implementer·Nepal location·Apr 29, 2020 → Jun 30, 2026 timeline

Overview

About this project

This includes all the construction cost required for the construction of water supply schemes and water treatment facilities and the technical human resources required to deliver those construction work together with the cost required for water recharge ponds and various water use and optimisation measures including sanitation and hygiene facilities.

Record quality

95% complete

1 source · confidence 65%

Not reported by the available sources: partner organizations. This is intentionally shown as unavailable rather than estimated.

Report an update or correction

Progress

72%