Power Plant Extension SCECO (PPE SCECO), Nepal – Single Phase

The Power Plant Extension of SCECO will improve daily living condition and enhance economic opportunities by providing uninterrupted hydro-power supply to 1’400 customers, and get up to 500 new connections to the local power grid, in the area of Salleri/Garma/Phalpu (HDI 0.45-0.50). Additionally, it will mitigate uncontrolled deforestation by reducing the use of firewood for cooking, heating and lighting purposes, in an area (lying between 2400 – 3000m alt.) where forest regeneration is slow. The project will thus enhance the sustainable use of local water resources while contributing to the maintenance of resilience to climate change at the local level.

Save
USD 10K budget·USD 56K disbursed·Swiss Development Cooperation implementer·Nepal location·Timeline not reported timeline

Overview

About this project

The Power Plant Extension of SCECO will improve daily living condition and enhance economic opportunities by providing uninterrupted hydro-power supply to 1’400 customers, and get up to 500 new connections to the local power grid, in the area of Salleri/Garma/Phalpu (HDI 0.45-0.50). Additionally, it will mitigate uncontrolled deforestation by reducing the use of firewood for cooking, heating and lighting purposes, in an area (lying between 2400 – 3000m alt.) where forest regeneration is slow. The project will thus enhance the sustainable use of local water resources while contributing to the maintenance of resilience to climate change at the local level.

Record quality

75% complete

1 source · confidence 65%

Not reported by the available sources: start date, end date, partner organizations. This is intentionally shown as unavailable rather than estimated.