Skip to content

Dates incomplete or unavailable· WASH

Power Plant Extension SCECO (PPE SCECO), Nepal – Single Phase

The Power Plant Extension of SCECO will improve daily living condition and enhance economic opportunities by providing uninterrupted hydro-power supply to 1’400 customers, and get up to 500 new connections to the local power grid, in the area of Salleri/Garma/Phalpu (HDI 0.45-0.50). Additionally, it will mitigate uncontrolled deforestation by reducing the use of firewood for cooking, heating and lighting purposes, in an area (lying between 2400 – 3000m alt.) where forest regeneration is slow. The project will thus enhance the sustainable use of local water resources while contributing to the maintenance of resilience to climate change at the local level.

Source-reported status: active. Timeline labels use reported dates and do not verify current activity.

Save
USD 10K budget·USD 56K disbursed·Swiss Development Cooperation reporting organization·Nepal location·Timeline not reported timeline

Reported by Swiss Development Cooperation

Overview

About this project

The Power Plant Extension of SCECO will improve daily living condition and enhance economic opportunities by providing uninterrupted hydro-power supply to 1’400 customers, and get up to 500 new connections to the local power grid, in the area of Salleri/Garma/Phalpu (HDI 0.45-0.50). Additionally, it will mitigate uncontrolled deforestation by reducing the use of firewood for cooking, heating and lighting purposes, in an area (lying between 2400 – 3000m alt.) where forest regeneration is slow. The project will thus enhance the sustainable use of local water resources while contributing to the maintenance of resilience to climate change at the local level.

Field coverage

75% complete

1 source feed · 2 evidence versions

Completeness measures the presence of project fields. It is not a verification score. Multiple evidence versions can come from the same feed, and feeds can reproduce the same publisher's data.

Not reported by the available sources: start date, end date, partner organizations. This is intentionally shown as unavailable rather than estimated.

Report an update or correction

Reported disbursement / budget

556.4%

USD 56K reported disbursed against USD 10K reported budget. This financial ratio does not measure implementation or outcomes. The reported disbursement exceeds the reported budget; the bar is capped at 100%.

Provenance

Original project evidence

1 distinct source feed across 2 recorded evidence versions. These are not independent confirmations. Links below show the latest available version for each source page, up to 50 pages.

  • iati ↗

    https://d-portal.org/ctrack.html?aid=CH-4-2011004122

    Retrieved Oct 25, 2026 · Last checked Oct 25, 2026

Alignment

SDG focus

No SDGs tagged.