Reported end date passed· Governance
Local Governance and Community Development Programme (LGCDP)
As a result of this project, the demand side of local governance will be strengthened through the empowerment of right holders. Social mobilization interventions will enable beneficiaries to more effectively demand public services and hold national and local governments accountable. Simultaneously, the supply side will be strengthened. As a result, local bodies with strengthened institutional capacity and resources will provide services more effectively to the people, esp. to disadvantaged groups. In addition, an enabling policy environment will be promoted. Inter alia, this will help to prepare Nepal for a future federal system, as and when this system is defined in the new constitution.
Source-reported status: active. Timeline labels use reported dates and do not verify current activity.
Reported by Swiss Development Cooperation
Overview
About this project
As a result of this project, the demand side of local governance will be strengthened through the empowerment of right holders. Social mobilization interventions will enable beneficiaries to more effectively demand public services and hold national and local governments accountable. Simultaneously, the supply side will be strengthened. As a result, local bodies with strengthened institutional capacity and resources will provide services more effectively to the people, esp. to disadvantaged groups. In addition, an enabling policy environment will be promoted. Inter alia, this will help to prepare Nepal for a future federal system, as and when this system is defined in the new constitution.
Field coverage
95% complete
Completeness measures the presence of project fields. It is not a verification score. Multiple evidence versions can come from the same feed, and feeds can reproduce the same publisher's data.
Not reported by the available sources: partner organizations. This is intentionally shown as unavailable rather than estimated.
Report an update or correctionReported disbursement / budget
100.0%USD 2.1M reported disbursed against USD 2.1M reported budget. This financial ratio does not measure implementation or outcomes. The reported disbursement exceeds the reported budget; the bar is capped at 100%.
Provenance
Original project evidence
1 distinct source feed across 6 recorded evidence versions. These are not independent confirmations. Links below show the latest available version for each source page, up to 50 pages.
- iati ↗
https://d-portal.org/ctrack.html?aid=CH-4-2008004735
Retrieved Oct 26, 2026 · Last checked Oct 26, 2026
- iati ↗
https://d-portal.org/ctrack.html?aid=CH-4-2008004734
Retrieved Oct 26, 2026 · Last checked Oct 26, 2026
- iati ↗
https://d-portal.org/ctrack.html?aid=CH-4-2008004733
Retrieved Oct 26, 2026 · Last checked Oct 26, 2026
Alignment