Skip to content
WB

TenderClosed

Tender Design and Preparation of Bidding Document (Phase A), Construction Supervision and post Construction Services (Phase B & C) for the Upper Arun Hydroelectric Project

World Bank Nepal · Nepal
View original notice ↗View organizationSave
Category
Tender
Procuring entity
World Bank Nepal
Published
May 29, 2026

Source

World Bank Procurement

Official public source

Last seen

May 29, 2026

The date Nepal Impact retrieved this source record.

Deadline evidence

Not supplied — check source

Report a problem

About this tender

Contract Award Project: P178722-Upper Arun Hydroelectric Project Loan/Credit/TF Info: - Bid/Contract Reference No: NP-UAHEL-336951-CS-QCBS Procurement Method: QCBS-Quality And Cost-Based Selection Scope of Contract: Technical Score is in 100 Full marks & should be multiplied by 0.85 for combined evaluation as weightage of T-score is 85% & the F-score is 15%.AECOM & Stantec Contract price is same as evaluated one. Notice Version No: 0 Date Notification of Award Issued (YYYY/MM/DD) 2024/01/11 Duration of Contract 117 Month(s) Minimum Qualifying Score 800 Awarded Firm(s): TRACTEBEL ENGINEERING S.A. (700943) Country: France Beneficial Ownership Details Form Date: 22-JAN-24 Summary of Reason There is no beneficial ownership meeting any conditions. WAPCOS LIMITED (592857) New Delhi Country: India Beneficial Ownership Details Form Date: 22-JAN-24 Name Nationality Residence Country Conditions Met Amitabh Tripathi IN India Directly or indirectly holding 25% or more of the shares, Directly or indirectly holding 25 % or more of the Voting Rights, Directly or indirectly having the right to appoint a majority of the board of the directors or an equivalent TRACTEBEL ENGINEERING GMBH (700961) Country: Germany Beneficial Ownership Details Form Date: 21-JAN-24 Summary of Reason There is no beneficial ownership meeting any conditions. Scores Technical: 93.29 Consultant Specific Experience: 10 Methodology: 29.61 Key Personnel: 49.04 Transfer of Knowledge: 4.42 Participation by Nationals: 0.22 Financial: 15 Combined: 94.30 Rank: 1 Final Evaluation Price NPR 3497757320.40 Signed Contract Price EUR 23384807.6; NPR 643047800.5; USD 445000.00 Price: Currency: Amount: Euro (Euro) 23384807.6 Nepalese Rupees (Nepalese Rupees) 643047800.5 United States Dollars (United States Dollars) 445000.00 Evaluated Firm(s): STANTEC CONSULTING SERVICES, INC. (700745) Country: United States STANTEC INTERNATIONAL CONSULTING INC. (700751) Country: United States Final Evaluation Price NPR 5334755690.99 Price: Currency: Amount: LOMBARDI SA INGEGNERI CONSULENTI (700715) Country: Switzerland AECOM CONSULTANTS INC. (700714) Country: Canada Final Evaluation Price NPR 5214905680.26 Price: Currency: Amount: Rejected Firm(s): SU-YAPI ENGINEERING AND CONSULTING INC. (689372) Country: Turkey NATIONAL ENGINEERING SERVICES (PAKISTAN) LIMITED (700948) Country: Pakistan CHINA WATER RESOURCES BEIFANG INVESTIGATION, DESIGN AND RESEARCH CO., LTD. (510312) Country: China Final Evaluation Price Reason for Rejection Failure to meet minimum technical score Price: Currency: Amount:

Aggregated from World Bank Procurement. Read the full posting on World Bank Procurement ↗